PackEye Reseat FHT 681 Connections

Last Updated: 05/03/2025 1:42 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
6202 - 6201 - Uninstall FHT 681 Amplifier; Remark:
Procedure Step
Published
11/21/2022 8:55 AM
6201 - Uninstall FHT 681 Amplifier
Instruction
Published
11/21/2022 8:55 AM
6198 - 313 - Power off instrument; Remark:5939
Procedure Step
Published
04/07/2025 4:34 PM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
5939 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
11/07/2022 2:33 PM
6199 - 4222 - Place instrument on flat surface; Remark:4221
Procedure Step
Published
11/21/2022 8:59 AM
4222 - Place instrument on flat surface
Instruction
Published
05/10/2022 1:54 PM
4221 - Shoulder straps should be facing down.
Remark
Published
05/10/2022 1:55 PM
6200 - 3876 - Open top of backpack; Remark:5665
Procedure Step
Published
11/21/2022 9:06 AM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
5665 - IO PackEye Open Top for Battery
Remark
Published
11/09/2024 8:06 PM
6217 - 6216 - Disconnect straps on sides of backpack; Remark:6215
Procedure Step
Published
11/28/2022 9:50 AM
6216 - Disconnect straps on sides of backpack
Instruction
Published
11/28/2022 9:46 AM
6215 -
Remark
Published
11/28/2022 9:50 AM
6224 - 6223 - Partially remove backpack contents; Remark:6222
Procedure Step
Published
11/28/2022 9:57 AM
6223 - Partially remove backpack contents
Instruction
Published
11/28/2022 9:52 AM
6222 - Slowly slide foam assembly out of backpack to access FHT 681 amplifier. This ...
Remark
Published
11/28/2022 9:57 AM
6225 - 6221 - Disconnect gamma detector; Remark:6220
Procedure Step
Published
11/28/2022 10:03 AM
6221 - Disconnect gamma detector
Instruction
Published
11/28/2022 9:59 AM
6220 - The gamma detector is connected to the FHT 681 amplifier at PMT1
Remark
Published
11/28/2022 10:03 AM
6226 - 6219 - Disconnect RS-232 jumper and distribution box connections; Remark:5670
Procedure Step
Published
11/28/2022 10:07 AM
6219 - Disconnect RS-232 jumper and distribution box connections
Instruction
Published
11/28/2022 10:04 AM
5670 - Use small, slotted screwdriver.
Remark
Published
11/03/2022 9:07 AM
6218 -
Remark
Published
11/28/2022 10:06 AM
6231 - 6229 - Rotate power supply and FHT 681 modules; Remark:6227
Procedure Step
Published
11/28/2022 10:13 AM
6230 - Caution : Do not completely remove FHT 681 module as neutron detectors are still connec...
Annotation
Published
11/28/2022 10:13 AM
6229 - Rotate power supply and FHT 681 modules
Instruction
Published
11/28/2022 10:09 AM
6227 - The neutron detector connections will be accessible.
Remark
Published
11/28/2022 10:10 AM
6228 -
Remark
Published
11/28/2022 10:12 AM
6235 - 6234 - Disconnect two (2) neutron detectors; Remark:6232
Procedure Step
Published
11/28/2022 10:18 AM
6234 - Disconnect two (2) neutron detectors
Instruction
Published
11/28/2022 10:15 AM
6232 - There are two (2) neutron detectors. Unscrew collar counterclockwise. Pull co...
Remark
Published
11/28/2022 10:17 AM
6233 -
Remark
Published
11/28/2022 10:18 AM
6240 - 6238 - Separate FHT 681 amplifier from power supply module; Remark:6236
Procedure Step
Published
11/28/2022 10:24 AM
6239 - Note : The hook and loop strips may require significant force to separate.
Annotation
Published
11/28/2022 10:24 AM
6238 - Separate FHT 681 amplifier from power supply module
Instruction
Published
11/28/2022 10:20 AM
6236 - There are two (2) hook and loop (Velcro) strips attaching the power supply mo...
Remark
Published
11/28/2022 10:22 AM
6237 -
Remark
Published
11/28/2022 10:23 AM
6249 - 6248 - Disassemble FHT 681 Amplifier; Remark:
Procedure Step
Published
11/28/2022 1:15 PM
6248 - Disassemble FHT 681 Amplifier
Instruction
Published
11/28/2022 1:15 PM
6246 - 6245 - Remove four (4) corner screws; Remark:5296
Procedure Step
Published
11/28/2022 1:19 PM
6245 - Remove four (4) corner screws
Instruction
Published
11/28/2022 1:16 PM
5296 - Use small Phillips (PH1) screwdriver. Retain screws.
Remark
Published
10/24/2022 9:12 AM
6244 -
Remark
Published
11/28/2022 1:19 PM
6247 - 6243 - Remove four (4) jack screws.; Remark:6241
Procedure Step
Published
11/28/2022 1:25 PM
6243 - Remove four (4) jack screws.
Instruction
Published
11/28/2022 1:21 PM
6241 - Use a 5-mm nut driver or small needle nose pliers.
Remark
Published
11/28/2022 1:22 PM
6242 -
Remark
Published
11/28/2022 1:23 PM
6255 - 6252 - Slide out serial communication assembly; Remark:6250
Procedure Step
Published
11/28/2022 1:42 PM
6253 - Caution : Ribbon cable is still attached. Only slide out serial communication assembly ...
Annotation
Published
11/28/2022 1:42 PM
6254 - Note : Do not misplace the rubber gasket.
Annotation
Published
11/28/2022 1:42 PM
6252 - Slide out serial communication assembly
Instruction
Published
11/28/2022 1:39 PM
6250 - Ribbon cable is still attached internally. Pull panel until ribbon cable is a...
Remark
Published
11/28/2022 1:40 PM
6251 -
Remark
Published
11/28/2022 1:41 PM
6258 - 6257 - Disconnect ribbon cable; Remark:6256
Procedure Step
Published
11/28/2022 1:44 PM
6257 - Disconnect ribbon cable
Instruction
Published
11/28/2022 1:43 PM
6256 -
Remark
Published
11/28/2022 1:44 PM
6261 - 6245 - Remove four (4) corner screws; Remark:5296
Procedure Step
Published
11/28/2022 1:49 PM
6260 - Caution : Do not remove the two (2) center screws.
Annotation
Published
11/28/2022 1:49 PM
6259 -
Remark
Published
11/28/2022 1:48 PM
6265 - 6264 - Note the notch where internal board mounted; Remark:6262
Procedure Step
Published
11/28/2022 1:52 PM
6264 - Note the notch where internal board mounted
Instruction
Published
11/28/2022 1:51 PM
6262 - It is recommended to mark the location with a permanent marker.
Remark
Published
11/28/2022 1:51 PM
6263 -
Remark
Published
11/28/2022 1:52 PM
6268 - 5702 - Remove electronics; Remark:6266
Procedure Step
Published
11/28/2022 1:56 PM
6267 - Note : Do not lose the gasket used to seal around the seam of the plate face to the ...
Annotation
Published
11/28/2022 1:55 PM
5702 - Remove electronics
Instruction
Published
11/03/2022 10:50 AM
6266 -
Remark
Published
11/28/2022 1:55 PM
6277 - 6276 - Inspect FHT 681 Amplifier; Remark:
Procedure Step
Published
11/28/2022 3:22 PM
6276 - Inspect FHT 681 Amplifier
Instruction
Published
11/28/2022 3:22 PM
6274 - 6273 - Check for loose debris; Remark:
Procedure Step
Published
11/28/2022 3:23 PM
6273 - Check for loose debris
Instruction
Published
11/28/2022 3:23 PM
6275 - 6271 - Check for loose connection mounts; Remark:6269
Procedure Step
Published
11/28/2022 3:27 PM
6272 - Caution : Do not rotate the whole connection assembly or it may break the attached resi...
Annotation
Published
11/28/2022 3:27 PM
6271 - Check for loose connection mounts
Instruction
Published
11/28/2022 3:24 PM
6269 - Check that the two (2) neutron detector and one (1) gamma cable connector gro...
Remark
Published
11/28/2022 3:25 PM
6270 -
Remark
Published
11/28/2022 3:26 PM
6281 - 6280 - Reseat ribbon cable; Remark:6278
Procedure Step
Published
11/28/2022 3:30 PM
6280 - Reseat ribbon cable
Instruction
Published
11/28/2022 3:29 PM
6278 - Disconnect and reconnect ribbon cable several times to remove oxidation. Veri...
Remark
Published
11/28/2022 3:29 PM
6279 -
Remark
Published
11/28/2022 3:30 PM
6287 - 6286 - Reassemble FHT 681 Amplifier; Remark:
Procedure Step
Published
11/28/2022 3:33 PM
6286 - Reassemble FHT 681 Amplifier
Instruction
Published
11/28/2022 3:33 PM
6285 - 5720 - Replace electronics; Remark:6282
Procedure Step
Published
11/28/2022 3:36 PM
5720 - Replace electronics
Instruction
Published
11/03/2022 1:11 PM
6282 - Align circuit board with fourth slot from bottom of enclosure and slide into ...
Remark
Published
11/28/2022 3:34 PM
6283 -
Remark
Published
11/28/2022 3:35 PM
6284 -
Remark
Published
11/28/2022 3:36 PM
6289 - 5718 - Align gasket; Remark:5717
Procedure Step
Published
11/28/2022 3:39 PM
6288 - Caution : If the gasket is misaligned, the instrument could show false alarms due to RF...
Annotation
Published
11/28/2022 3:39 PM
5718 - Align gasket
Instruction
Published
11/03/2022 1:16 PM
5717 - Verify gasket is aligned between housing and end panel before inserting screw...
Remark
Published
11/03/2022 1:18 PM
6345 -
Remark
Published
11/29/2022 10:31 AM
6293 - 6292 - Replace four (4) corner screws; Remark:6290
Procedure Step
Published
11/29/2022 8:08 AM
6292 - Replace four (4) corner screws
Instruction
Published
11/29/2022 8:06 AM
6290 - Use small Phillips (PH1) screwdriver. Attach each screw loosely until all are...
Remark
Published
11/29/2022 8:07 AM
6291 -
Remark
Published
11/29/2022 8:08 AM
6298 - 6297 - Verify RS-232 gaskets are in place; Remark:6296
Procedure Step
Published
11/29/2022 8:12 AM
6297 - Verify RS-232 gaskets are in place
Instruction
Published
11/29/2022 8:10 AM
6296 -
Remark
Published
11/29/2022 8:12 AM
6299 - 6295 - Reconnect ribbon cable; Remark:6294
Procedure Step
Published
11/29/2022 8:14 AM
6295 - Reconnect ribbon cable
Instruction
Published
11/29/2022 8:13 AM
6294 -
Remark
Published
11/29/2022 8:14 AM
6307 - 5718 - Align gasket; Remark:5717
Procedure Step
Published
11/29/2022 8:19 AM
6306 -
Remark
Published
11/29/2022 8:19 AM
6308 - 6305 - Insert serial port face; Remark:6303
Procedure Step
Published
11/29/2022 8:23 AM
6305 - Insert serial port face
Instruction
Published
11/29/2022 8:20 AM
6303 - Align serial port openings with internal serial port connectors.
Remark
Published
11/29/2022 8:21 AM
6304 -
Remark
Published
11/29/2022 8:23 AM
6309 - 6302 - Insert four (4) jack screws; Remark:6300
Procedure Step
Published
11/29/2022 8:25 AM
6302 - Insert four (4) jack screws
Instruction
Published
11/29/2022 8:23 AM
6300 - Attach each screw loosely until all are inserted and then tighten. Use 5-mm n...
Remark
Published
11/29/2022 8:24 AM
6301 -
Remark
Published
11/29/2022 8:25 AM
6312 - 6311 - Insert four (4) corner screws; Remark:6290
Procedure Step
Published
11/29/2022 8:30 AM
6311 - Insert four (4) corner screws
Instruction
Published
11/29/2022 8:28 AM
6310 -
Remark
Published
11/29/2022 8:30 AM
6322 - 6321 - Reinstall FHT 681 Amplifier; Remark:
Procedure Step
Published
11/29/2022 8:37 AM
6321 - Reinstall FHT 681 Amplifier
Instruction
Published
11/29/2022 8:37 AM
6319 - 6318 - Connect FHT 681 amplifier to power supply module; Remark:6316
Procedure Step
Published
11/29/2022 8:40 AM
6318 - Connect FHT 681 amplifier to power supply module
Instruction
Published
11/29/2022 8:38 AM
6316 - A significant force might be required to rejoin the components. A snap should...
Remark
Published
11/29/2022 8:39 AM
6317 -
Remark
Published
11/29/2022 8:40 AM
6320 - 6315 - Reconnect neutron detectors; Remark:6313
Procedure Step
Published
11/29/2022 8:44 AM
6315 - Reconnect neutron detectors
Instruction
Published
11/29/2022 8:41 AM
6313 - There are two (2) neutron detectors. Push connector onto detector. Turn colla...
Remark
Published
11/29/2022 8:43 AM
6314 -
Remark
Published
11/29/2022 8:44 AM
6331 - 6330 - Reconnect RS-232 jumper and distribution box; Remark:5670
Procedure Step
Published
11/29/2022 9:15 AM
6330 - Reconnect RS-232 jumper and distribution box
Instruction
Published
11/29/2022 9:13 AM
6329 -
Remark
Published
11/29/2022 9:15 AM
6332 - 6328 - Reseat gamma connectors; Remark:6326
Procedure Step
Published
11/29/2022 9:18 AM
6328 - Reseat gamma connectors
Instruction
Published
11/29/2022 9:15 AM
6326 - The gamma detector is connected at the FHT 681 amplifier at the connection la...
Remark
Published
11/30/2022 12:21 PM
6327 -
Remark
Published
11/29/2022 9:18 AM
6333 - 6325 - Repack backpack; Remark:6323
Procedure Step
Published
11/29/2022 9:20 AM
6325 - Repack backpack
Instruction
Published
11/29/2022 9:18 AM
6323 - Slide the protective foam assembly into backpack
Remark
Published
11/29/2022 9:19 AM
6324 -
Remark
Published
11/29/2022 9:20 AM
6344 - 1383 - Close backpack; Remark:6343
Procedure Step
Published
11/29/2022 10:11 AM
1383 - Close backpack
Instruction
Published
11/19/2020 5:23 PM
6343 -
Remark
Published
11/29/2022 10:11 AM
6342 - 6341 - Perform Gamma High Voltage Adjustment; Remark:6340
Procedure Step
Published
11/29/2022 10:13 AM
6341 - Perform Gamma High Voltage Adjustment
Instruction
Published
11/29/2022 10:12 AM
6340 - DET-HHD-THR-PAK-RM05, PackEye Gamma High Voltage Adjustment.
Remark
Published
11/29/2022 10:13 AM
6339 - 319 - Perform operational test; Remark:6337
Procedure Step
Published
04/08/2025 2:14 PM
319 - Perform operational test
Instruction
Published
06/10/2021 8:31 PM
6337 - DET-HHD-THR-PAK-RM01, PackEye Operational Test.
Remark
Published
11/29/2022 10:14 AM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
30 minutes
Duration
Published
04/01/2020 11:35 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Technician 2
Skill Level
Published
04/09/2020 1:17 AM
5-mm (1/4 inch) nut driver or socket
Tools
Published
05/14/2020 3:21 PM
Small Phillips (PH1) screwdriver
Tools
Published
05/14/2020 2:48 PM
Small slotted (flathead) screwdriver
Tools
Published
09/11/2020 11:23 AM
Small needle nose pliers
Tools
Published
11/21/2022 9:06 AM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_sidebuckle_open_outside.jpg
Image
Published
10/24/2023 10:18 AM
packeye_di_content_remove_4arrow.jpg
Image
Published
10/24/2023 10:20 AM
packeye_di_expose681_redbox.jpg
Image
Published
10/24/2023 10:23 AM
packeye_di_681removepmt1connector.jpg
Image
Published
10/24/2023 10:24 AM
packeye_di_rs232_distrocable_remove_2arrows.jpg
Image
Published
10/24/2023 10:30 AM
packeye_di_681powermodule_rotate.jpg
Image
Published
10/24/2023 10:33 AM
packeye_di_neutron_disconnect12.jpg
Image
Published
10/24/2023 10:34 AM
packeye_di_681powermodule_split.jpg
Image
Published
10/24/2023 10:36 AM
packeye_di_681serial_cornerscrews_4circle.jpg
Image
Published
10/24/2023 10:39 AM
packeye_di_681_9pinplugscrews_4circle.jpg
Image
Published
10/24/2023 10:40 AM
packeye_di_681serialcomm_remove_2arrow.jpg
Image
Published
10/24/2023 10:42 AM
packeye_di_681serialcomm_removeconnector.jpg
Image
Published
10/24/2023 10:44 AM
packeye_di_681pmt_cornerscrews_2cross4circle.jpg
Image
Published
10/24/2023 10:27 AM
packeye_di_681electronicsPCB_4thslot.jpg
Image
Published
10/24/2023 10:45 AM
packeye_di_681electronicsPCB_remove.jpg
Image
Published
10/24/2023 10:46 AM
packeye_di_681electronics_groundingnut_3circle.jpg
Image
Published
10/24/2023 10:47 AM
packeye_di_681ribboncable.jpg
Image
Published
10/24/2023 10:48 AM
packeye_di_681electronicsPCB_install.jpg
Image
Published
10/24/2023 10:49 AM
packeye_di_681pmt_EMIgasket_5arrow.jpg
Image
Published
10/24/2023 10:51 AM
packeye_di_681pmt_cornerscrews_4circle.jpg
Image
Published
10/24/2023 10:26 AM
packeye_di_681electronics_rs232gasket_4arrow.jpg
Image
Published
10/24/2023 10:53 AM
packeye_di_681serialcomm_installconnector.jpg
Image
Published
10/24/2023 10:54 AM
packeye_di_681rs232_EMIgasket_5arrow.jpg
Image
Published
10/24/2023 10:56 AM
packeye_di_681serialcomm_install_1arrow.jpg
Image
Published
10/24/2023 10:55 AM
packeye_di_681powermodule_join.jpg
Image
Published
10/24/2023 10:37 AM
packeye_di_neutron_connect21.jpg
Image
Published
10/24/2023 10:35 AM
packeye_di_rs232_distrocable_install_2arrows.jpg
Image
Published
10/24/2023 10:32 AM
packeye_di_681installpmt1connector.jpg
Image
Published
10/24/2023 10:25 AM
packeye_di_content_insert_2arrow.jpg
Image
Published
10/24/2023 10:21 AM
packeye_di_closetop_redarrow.jpg
Image
Published
10/24/2023 10:59 AM

PackEye Reseat Power Supply Connections

Last Updated: 05/03/2025 1:42 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
5662 - 5661 - Uninstall Power Supply Module; Remark:
Procedure Step
Published
11/02/2022 5:10 PM
5661 - Uninstall Power Supply Module
Instruction
Published
11/02/2022 5:09 PM
5660 - 313 - Power off instrument; Remark:4086
Procedure Step
Published
04/07/2025 4:34 PM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
4086 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
05/02/2022 6:04 PM
5666 - 4222 - Place instrument on flat surface; Remark:4221
Procedure Step
Published
11/03/2022 8:17 AM
4222 - Place instrument on flat surface
Instruction
Published
05/10/2022 1:54 PM
4221 - Shoulder straps should be facing down.
Remark
Published
05/10/2022 1:55 PM
5667 - 3876 - Open top of backpack; Remark:5665
Procedure Step
Published
11/03/2022 8:21 AM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
5665 - IO PackEye Open Top for Battery
Remark
Published
11/09/2024 8:06 PM
5668 - 4219 - Remove distribution box; Remark:4218
Procedure Step
Published
11/03/2022 8:22 AM
4219 - Remove distribution box
Instruction
Published
05/10/2022 1:58 PM
4218 - The distribution box is usually located in the top of the backpack.
Remark
Published
05/10/2022 1:58 PM
5669 - 4217 - Disconnect battery cable; Remark:4216
Procedure Step
Published
11/03/2022 8:47 AM
5664 - Note : The other cord connected to the distribution box is the headphone plug.
Annotation
Published
11/03/2022 8:47 AM
4217 - Disconnect battery cable
Instruction
Published
05/10/2022 2:01 PM
4216 - Rotate the collar counterclockwise and pull straight out. The battery cable c...
Remark
Published
05/10/2022 2:03 PM
5673 - 5672 - Disconnect RS232 jumper; Remark:5670
Procedure Step
Published
11/03/2022 9:07 AM
5672 - Disconnect RS232 jumper
Instruction
Published
11/03/2022 9:03 AM
5670 - Use small, slotted screwdriver.
Remark
Published
11/03/2022 9:07 AM
5671 - IO PackEye RS232 Disconnect Cable
Remark
Published
11/09/2024 8:07 PM
5680 - 5679 - Disconnect Bluetooth adapter cable; Remark:5670
Procedure Step
Published
11/03/2022 9:15 AM
5679 - Disconnect Bluetooth adapter cable
Instruction
Published
11/03/2022 9:12 AM
5678 - IO PackEye Cable for BTA Disconnect
Remark
Published
11/09/2024 8:08 PM
5681 - 5677 - Remove wire ties; Remark:5676
Procedure Step
Published
11/03/2022 9:27 AM
5677 - Remove wire ties
Instruction
Published
11/03/2022 9:16 AM
5676 - Note location of wire ties for reassembly. Use wire cutter or scissors.
Remark
Published
11/03/2022 9:27 AM
5770 - IO PackEye Power Cable Ties Location
Remark
Published
11/09/2024 8:08 PM
5682 - 5675 - Remove power supply module; Remark:5674
Procedure Step
Published
11/03/2022 9:35 AM
5675 - Remove power supply module
Instruction
Published
11/03/2022 9:31 AM
5674 - There are Velcro strips securing the power supply module to the FHT 681 ampli...
Remark
Published
11/03/2022 9:35 AM
5783 - 5782 - Inspect Internal Components; Remark:
Procedure Step
Published
11/03/2022 3:19 PM
5782 - Inspect Internal Components
Instruction
Published
11/03/2022 3:19 PM
5821 - 5309 - Remove two (2) screws; Remark:5819
Procedure Step
Published
11/04/2022 7:38 AM
5309 - Remove two (2) screws
Instruction
Published
10/24/2022 9:50 AM
5819 - Only remove the screws on the side with the charger connector. Use T-10 Torx ...
Remark
Published
11/04/2022 7:36 AM
5704 - IO PackEye Power Module Screws
Remark
Published
11/09/2024 8:09 PM
5822 - 5702 - Remove electronics; Remark:5818
Procedure Step
Published
11/04/2022 7:42 AM
5702 - Remove electronics
Instruction
Published
11/03/2022 10:50 AM
5818 - Components will slide out of the housing.
Remark
Published
11/04/2022 7:42 AM
5823 - 5817 - Inspect internal board for damage; Remark:5816
Procedure Step
Published
11/04/2022 7:46 AM
5817 - Inspect internal board for damage
Instruction
Published
11/04/2022 7:44 AM
5816 - Check for loose connections, burn marks, and debris. Check battery for leakag...
Remark
Published
11/04/2022 7:46 AM
5824 - 5815 - Inspect underside of circuit board; Remark:5814
Procedure Step
Published
11/04/2022 7:50 AM
5815 - Inspect underside of circuit board
Instruction
Published
11/04/2022 7:48 AM
5814 - Check for loose connections, burn marks, and debris. Check USB port for damag...
Remark
Published
11/04/2022 7:50 AM
5825 - 5813 - Disconnect spade connectors; Remark:5812
Procedure Step
Published
11/04/2022 7:55 AM
5813 - Disconnect spade connectors
Instruction
Published
11/04/2022 7:52 AM
5812 - If wires are soldered to the board, skip this step.
Remark
Published
11/04/2022 7:55 AM
5826 - 5811 - Reconnect spade connectors from battery to internal board; Remark:5810
Procedure Step
Published
11/04/2022 7:59 AM
5553 - Caution : Correct placement of connectors and wiring is critical to proper operation.
Annotation
Published
10/28/2022 2:19 PM
5811 - Reconnect spade connectors from battery to internal board
Instruction
Published
11/04/2022 7:56 AM
5810 - Ensure the black wire is connected closest to the edge of the board.
Remark
Published
11/04/2022 7:58 AM
5827 - 5720 - Replace electronics; Remark:5719
Procedure Step
Published
11/04/2022 8:03 AM
5721 - Caution : Circuit board must be inserted correctly to prevent damage to components....
Annotation
Published
11/03/2022 1:15 PM
5720 - Replace electronics
Instruction
Published
11/03/2022 1:11 PM
5719 - Align circuit board with third slot from bottom of enclosure and slide into p...
Remark
Published
11/03/2022 1:15 PM
5828 - 5718 - Align gasket; Remark:5717
Procedure Step
Published
11/04/2022 8:06 AM
5718 - Align gasket
Instruction
Published
11/03/2022 1:16 PM
5717 - Verify gasket is aligned between housing and end panel before inserting screw...
Remark
Published
11/03/2022 1:18 PM
5829 - 5716 - Reinstall two (2) enclosure screws; Remark:5714
Procedure Step
Published
11/04/2022 8:09 AM
5716 - Reinstall two (2) enclosure screws
Instruction
Published
11/03/2022 1:19 PM
5714 - Use T-10 Torx screwdriver.
Remark
Published
11/03/2022 1:20 PM
5780 - 5779 - Reinstall Power Supply Module; Remark:
Procedure Step
Published
11/03/2022 1:25 PM
5779 - Reinstall Power Supply Module
Instruction
Published
11/03/2022 1:25 PM
5834 - 5775 - Secure power supply module to FHT 681; Remark:5774
Procedure Step
Published
11/04/2022 9:29 AM
5775 - Secure power supply module to FHT 681
Instruction
Published
11/03/2022 2:46 PM
5774 - The module will snap into place.
Remark
Published
11/03/2022 2:50 PM
5835 - 5773 - Reconnect battery cable; Remark:5772
Procedure Step
Published
11/04/2022 9:30 AM
5773 - Reconnect battery cable
Instruction
Published
11/03/2022 2:51 PM
5772 - Align the connector and push in. Rotate collar clockwise and hand-tighten.
Remark
Published
11/03/2022 2:55 PM
5836 - 5771 - Install wire ties; Remark:5769
Procedure Step
Published
11/04/2022 9:33 AM
5771 - Install wire ties
Instruction
Published
11/03/2022 2:56 PM
5769 - If desired, install new wire ties and cut off excess.
Remark
Published
11/03/2022 3:05 PM
5837 - 4237 - Replace distribution box; Remark:4236
Procedure Step
Published
11/04/2022 9:43 AM
4237 - Replace distribution box
Instruction
Published
05/10/2022 2:15 PM
4236 - IO PackEye Distro Box Install
Remark
Published
10/24/2024 6:53 PM
5838 - 5788 - Reconnect Bluetooth adapter cable; Remark:5787
Procedure Step
Published
11/04/2022 9:45 AM
5788 - Reconnect Bluetooth adapter cable
Instruction
Published
11/03/2022 3:17 PM
5787 - IO PackEye Cable for BTA Connect
Remark
Published
11/09/2024 8:13 PM
5839 - 5786 - Reconnect RS232 jumper; Remark:5670
Procedure Step
Published
11/04/2022 9:49 AM
5786 - Reconnect RS232 jumper
Instruction
Published
11/03/2022 3:39 PM
5830 - IO PackEye RS232 Connect Cable
Remark
Published
11/09/2024 8:14 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
minutes
Duration
Published
05/26/2022 11:41 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
Small slotted (flathead) screwdriver
Tools
Published
09/11/2020 11:23 AM
Wire cutter pliers
Tools
Published
10/27/2022 1:20 PM
T10 Torx screwdriver
Tools
Published
11/10/2022 12:57 PM
Medium pliers
Tools
Published
11/03/2022 2:20 PM
Needle nose pliers
Tools
Published
05/06/2020 4:10 PM
Fluke 179 Digital Multimeter (DMM)
Tools
Published
03/20/2021 6:27 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_distrobox_remove.jpg
Image
Published
10/20/2023 4:00 PM
packeye_di_batterycable_remove.jpg
Image
Published
10/20/2023 3:54 PM
packeye_di_batterycable_2prong.jpg
Image
Published
10/20/2023 3:51 PM
packeye_di_rs232cable_remove.jpg
Image
Published
10/23/2023 9:49 AM
packeye_di_rs232btadisconnect.jpg
Image
Published
10/23/2023 1:46 PM
packeye_di_powercable_ties_locate.jpg
Image
Published
10/20/2023 4:02 PM
packeye_di_powermodule_remove.jpg
Image
Published
10/20/2023 4:04 PM
packeye_di_powersupp_screws.jpg
Image
Published
10/23/2023 1:47 PM
packeye_di_powersupp_slideopen.jpg
Image
Published
10/23/2023 1:48 PM
packeye_di_powersupp_internalview.jpg
Image
Published
10/23/2023 1:50 PM
packeye_di_powersupp_pcb.jpg
Image
Published
10/23/2023 1:51 PM
packeye_di_powersupp_spadeoff.jpg
Image
Published
10/23/2023 1:53 PM
packeye_di_powersupp_spadeon.jpg
Image
Published
10/23/2023 1:54 PM
packeye_di_powersupp_alignslot3.jpg
Image
Published
10/23/2023 1:55 PM
packeye_di_powersupp_slideclosed.jpg
Image
Published
10/23/2023 1:49 PM
packeye_di_powermodule_install.jpg
Image
Published
10/20/2023 4:03 PM
packeye_di_batterycable_install.jpg
Image
Published
10/20/2023 3:53 PM
packeye_di_distrobox_install.jpg
Image
Published
10/20/2023 3:59 PM
packeye_di_rs232btaconnectinsert.jpg
Image
Published
10/23/2023 1:44 PM
packeye_di_rs232cable_insert.jpg
Image
Published
10/23/2023 9:48 AM

PackEye Power Supply Replacement

Last Updated: 05/03/2025 1:42 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
5767 - 5766 - Uninstall Faulty Power Supply Module; Remark:
Procedure Step
Published
11/03/2022 2:45 PM
5766 - Uninstall Faulty Power Supply Module
Instruction
Published
11/03/2022 2:45 PM
5660 - 313 - Power off instrument; Remark:4086
Procedure Step
Published
04/07/2025 4:34 PM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
4086 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
05/02/2022 6:04 PM
5666 - 4222 - Place instrument on flat surface; Remark:4221
Procedure Step
Published
11/03/2022 8:17 AM
4222 - Place instrument on flat surface
Instruction
Published
05/10/2022 1:54 PM
4221 - Shoulder straps should be facing down.
Remark
Published
05/10/2022 1:55 PM
5667 - 3876 - Open top of backpack; Remark:5665
Procedure Step
Published
11/03/2022 8:21 AM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
5665 - IO PackEye Open Top for Battery
Remark
Published
11/09/2024 8:06 PM
5668 - 4219 - Remove distribution box; Remark:4218
Procedure Step
Published
11/03/2022 8:22 AM
4219 - Remove distribution box
Instruction
Published
05/10/2022 1:58 PM
4218 - The distribution box is usually located in the top of the backpack.
Remark
Published
05/10/2022 1:58 PM
5669 - 4217 - Disconnect battery cable; Remark:4216
Procedure Step
Published
11/03/2022 8:47 AM
5664 - Note : The other cord connected to the distribution box is the headphone plug.
Annotation
Published
11/03/2022 8:47 AM
4217 - Disconnect battery cable
Instruction
Published
05/10/2022 2:01 PM
4216 - Rotate the collar counterclockwise and pull straight out. The battery cable c...
Remark
Published
05/10/2022 2:03 PM
5673 - 5672 - Disconnect RS232 jumper; Remark:5670
Procedure Step
Published
11/03/2022 9:07 AM
5672 - Disconnect RS232 jumper
Instruction
Published
11/03/2022 9:03 AM
5670 - Use small, slotted screwdriver.
Remark
Published
11/03/2022 9:07 AM
5671 - IO PackEye RS232 Disconnect Cable
Remark
Published
11/09/2024 8:07 PM
5680 - 5679 - Disconnect Bluetooth adapter cable; Remark:5670
Procedure Step
Published
11/03/2022 9:15 AM
5679 - Disconnect Bluetooth adapter cable
Instruction
Published
11/03/2022 9:12 AM
5678 - IO PackEye Cable for BTA Disconnect
Remark
Published
11/09/2024 8:08 PM
5681 - 5677 - Remove wire ties; Remark:5676
Procedure Step
Published
11/03/2022 9:27 AM
5677 - Remove wire ties
Instruction
Published
11/03/2022 9:16 AM
5676 - Note location of wire ties for reassembly. Use wire cutter or scissors.
Remark
Published
11/03/2022 9:27 AM
5770 - IO PackEye Power Cable Ties Location
Remark
Published
11/09/2024 8:08 PM
5682 - 5675 - Remove power supply module; Remark:5674
Procedure Step
Published
11/03/2022 9:35 AM
5675 - Remove power supply module
Instruction
Published
11/03/2022 9:31 AM
5674 - There are Velcro strips securing the power supply module to the FHT 681 ampli...
Remark
Published
11/03/2022 9:35 AM
5765 - 5764 - Install New Power Supply Module; Remark:
Procedure Step
Published
11/03/2022 2:46 PM
5764 - Install New Power Supply Module
Instruction
Published
11/03/2022 2:45 PM
5843 - 5775 - Secure power supply module to FHT 681; Remark:5774
Procedure Step
Published
11/04/2022 10:56 AM
5775 - Secure power supply module to FHT 681
Instruction
Published
11/03/2022 2:46 PM
5774 - The module will snap into place.
Remark
Published
11/03/2022 2:50 PM
5844 - 5773 - Reconnect battery cable; Remark:5772
Procedure Step
Published
11/04/2022 10:57 AM
5773 - Reconnect battery cable
Instruction
Published
11/03/2022 2:51 PM
5772 - Align the connector and push in. Rotate collar clockwise and hand-tighten.
Remark
Published
11/03/2022 2:55 PM
5845 - 5771 - Install wire ties; Remark:5769
Procedure Step
Published
11/04/2022 10:59 AM
5771 - Install wire ties
Instruction
Published
11/03/2022 2:56 PM
5769 - If desired, install new wire ties and cut off excess.
Remark
Published
11/03/2022 3:05 PM
5846 - 4237 - Replace distribution box; Remark:4236
Procedure Step
Published
11/04/2022 11:03 AM
4237 - Replace distribution box
Instruction
Published
05/10/2022 2:15 PM
4236 - IO PackEye Distro Box Install
Remark
Published
10/24/2024 6:53 PM
5847 - 5788 - Reconnect Bluetooth adapter cable; Remark:5787
Procedure Step
Published
11/04/2022 11:05 AM
5788 - Reconnect Bluetooth adapter cable
Instruction
Published
11/03/2022 3:17 PM
5787 - IO PackEye Cable for BTA Connect
Remark
Published
11/09/2024 8:13 PM
5848 - 5786 - Reconnect RS232 jumper; Remark:5785
Procedure Step
Published
11/04/2022 11:06 AM
5786 - Reconnect RS232 jumper
Instruction
Published
11/03/2022 3:39 PM
5785 - Use small, slotted screwdriver to secure connector.
Remark
Published
11/16/2022 9:35 AM
5830 - IO PackEye RS232 Connect Cable
Remark
Published
11/09/2024 8:14 PM
5763 - 5762 - Check Battery Charging; Remark:
Procedure Step
Published
11/03/2022 2:48 PM
5762 - Check Battery Charging
Instruction
Published
11/03/2022 2:48 PM
5798 - 4718 - Connect charger; Remark:5797
Procedure Step
Published
11/03/2022 3:57 PM
4718 - Connect charger
Instruction
Published
06/29/2022 1:15 PM
5797 - IO PackEye Battery Charger Connection
Remark
Published
11/09/2024 8:15 PM
5807 - IO PackEye Battery Connect Cable
Remark
Published
11/09/2024 8:15 PM
5799 - 4716 - Verify instrument is charging; Remark:5752
Procedure Step
Published
11/03/2022 4:01 PM
4716 - Verify instrument is charging
Instruction
Published
06/29/2022 1:16 PM
5752 - CHARGE (yellow) and READY (green) LEDs will...
Remark
Published
11/10/2022 9:17 AM
5853 - 5796 - Charge Instrument; Remark:5795
Procedure Step
Published
11/04/2022 11:15 AM
5796 - Charge Instrument
Instruction
Published
11/03/2022 4:02 PM
5795 - It is recommended to fully charge the battery before first use. Only the gree...
Remark
Published
11/03/2022 4:04 PM
5761 - 319 - Perform operational test; Remark:5760
Procedure Step
Published
11/03/2022 2:58 PM
319 - Perform operational test
Instruction
Published
06/10/2021 8:31 PM
5760 - DET-HHD-THR-PAK-RM01, PackEye Operational Test
Remark
Published
11/03/2022 2:55 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
minutes
Duration
Published
05/26/2022 11:41 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
Small slotted (flathead) screwdriver
Tools
Published
09/11/2020 11:23 AM
Wire cutter pliers or scissors
Tools
Published
11/03/2022 2:20 PM
Medium pliers
Tools
Published
11/03/2022 2:20 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_distrobox_remove.jpg
Image
Published
10/20/2023 4:00 PM
packeye_di_batterycable_remove.jpg
Image
Published
10/20/2023 3:54 PM
packeye_di_batterycable_2prong.jpg
Image
Published
10/20/2023 3:51 PM
packeye_di_rs232cable_remove.jpg
Image
Published
10/23/2023 9:49 AM
packeye_di_rs232btadisconnect.jpg
Image
Published
10/23/2023 1:46 PM
packeye_di_powercable_ties_locate.jpg
Image
Published
10/20/2023 4:02 PM
packeye_di_powermodule_remove.jpg
Image
Published
10/20/2023 4:04 PM
packeye_di_powermodule_install.jpg
Image
Published
10/20/2023 4:03 PM
packeye_di_batterycable_install.jpg
Image
Published
10/20/2023 3:53 PM
packeye_di_distrobox_install.jpg
Image
Published
10/20/2023 3:59 PM
packeye_di_rs232btaconnectinsert.jpg
Image
Published
10/23/2023 1:44 PM
packeye_di_rs232cable_insert.jpg
Image
Published
10/23/2023 9:48 AM
packeye_di_battery_chargerconnector.jpg
Image
Published
10/23/2023 2:17 PM
packeye_di_charger_connect_redarrow_00783.jpg
Image
Published
10/20/2023 12:53 PM
packeye_di_batteryCHARGING_0.jpg
Image
Published
10/23/2023 1:43 PM
packeye_di_batteryREADY.jpg
Image
Published
10/23/2023 9:34 AM

PackEye Refurbish Power Supply

Last Updated: 05/03/2025 1:42 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
5662 - 5661 - Uninstall Power Supply Module; Remark:
Procedure Step
Published
11/02/2022 5:10 PM
5661 - Uninstall Power Supply Module
Instruction
Published
11/02/2022 5:09 PM
5660 - 313 - Power off instrument; Remark:4086
Procedure Step
Published
04/07/2025 4:34 PM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
4086 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
05/02/2022 6:04 PM
5666 - 4222 - Place instrument on flat surface; Remark:4221
Procedure Step
Published
11/03/2022 8:17 AM
4222 - Place instrument on flat surface
Instruction
Published
05/10/2022 1:54 PM
4221 - Shoulder straps should be facing down.
Remark
Published
05/10/2022 1:55 PM
5667 - 3876 - Open top of backpack; Remark:5665
Procedure Step
Published
11/03/2022 8:21 AM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
5665 - IO PackEye Open Top for Battery
Remark
Published
11/09/2024 8:06 PM
5668 - 4219 - Remove distribution box; Remark:4218
Procedure Step
Published
11/03/2022 8:22 AM
4219 - Remove distribution box
Instruction
Published
05/10/2022 1:58 PM
4218 - The distribution box is usually located in the top of the backpack.
Remark
Published
05/10/2022 1:58 PM
5669 - 4217 - Disconnect battery cable; Remark:4216
Procedure Step
Published
11/03/2022 8:47 AM
5664 - Note : The other cord connected to the distribution box is the headphone plug.
Annotation
Published
11/03/2022 8:47 AM
4217 - Disconnect battery cable
Instruction
Published
05/10/2022 2:01 PM
4216 - Rotate the collar counterclockwise and pull straight out. The battery cable c...
Remark
Published
05/10/2022 2:03 PM
5673 - 5672 - Disconnect RS232 jumper; Remark:5670
Procedure Step
Published
11/03/2022 9:07 AM
5672 - Disconnect RS232 jumper
Instruction
Published
11/03/2022 9:03 AM
5670 - Use small, slotted screwdriver.
Remark
Published
11/03/2022 9:07 AM
5671 - IO PackEye RS232 Disconnect Cable
Remark
Published
11/09/2024 8:07 PM
5680 - 5679 - Disconnect Bluetooth adapter cable; Remark:5670
Procedure Step
Published
11/03/2022 9:15 AM
5679 - Disconnect Bluetooth adapter cable
Instruction
Published
11/03/2022 9:12 AM
5678 - IO PackEye Cable for BTA Disconnect
Remark
Published
11/09/2024 8:08 PM
5681 - 5677 - Remove wire ties; Remark:5676
Procedure Step
Published
11/03/2022 9:27 AM
5677 - Remove wire ties
Instruction
Published
11/03/2022 9:16 AM
5676 - Note location of wire ties for reassembly. Use wire cutter or scissors.
Remark
Published
11/03/2022 9:27 AM
5770 - IO PackEye Power Cable Ties Location
Remark
Published
11/09/2024 8:08 PM
5682 - 5675 - Remove power supply module; Remark:5674
Procedure Step
Published
11/03/2022 9:35 AM
5675 - Remove power supply module
Instruction
Published
11/03/2022 9:31 AM
5674 - There are Velcro strips securing the power supply module to the FHT 681 ampli...
Remark
Published
11/03/2022 9:35 AM
5713 - 5712 - Remove Faulty Internal Battery; Remark:
Procedure Step
Published
11/03/2022 9:43 AM
5712 - Remove Faulty Internal Battery
Instruction
Published
11/03/2022 9:43 AM
5706 - 5705 - Remove two (2) enclosure screws; Remark:5703
Procedure Step
Published
11/03/2022 10:49 AM
5705 - Remove two (2) enclosure screws
Instruction
Published
11/03/2022 10:03 AM
5703 - Use T-10 Torx screwdriver. Remove the screws only on the side where the power...
Remark
Published
11/03/2022 10:05 AM
5704 - IO PackEye Power Module Screws
Remark
Published
11/09/2024 8:09 PM
5707 - 5702 - Remove electronics; Remark:5701
Procedure Step
Published
11/03/2022 10:53 AM
5702 - Remove electronics
Instruction
Published
11/03/2022 10:50 AM
5701 - IO PackEye Power Module Slide Open
Remark
Published
11/09/2024 8:12 PM
5708 - 1813 - Disconnect battery; Remark:5808
Procedure Step
Published
11/03/2022 11:02 AM
1813 - Disconnect battery
Instruction
Published
11/20/2020 9:31 AM
5808 - IO PackEye Power Battery Disconnect
Remark
Published
11/09/2024 8:12 PM
5709 - 5700 - Cut wire ties; Remark:5699
Procedure Step
Published
11/03/2022 12:28 PM
5700 - Cut wire ties
Instruction
Published
11/03/2022 12:26 PM
5699 - Use wire cutters.
Remark
Published
11/03/2022 12:28 PM
5710 - 5270 - Remove battery; Remark:
Procedure Step
Published
11/03/2022 12:30 PM
5270 - Remove battery
Instruction
Published
10/17/2022 2:02 PM
5711 - 5698 - Remove foam pad from faulty battery; Remark:5697
Procedure Step
Published
11/03/2022 12:33 PM
5698 - Remove foam pad from faulty battery
Instruction
Published
11/03/2022 12:31 PM
5697 - Set aside to reuse on new battery.
Remark
Published
11/03/2022 12:33 PM
5744 - 5743 - Install New Internal Battery; Remark:
Procedure Step
Published
11/03/2022 12:49 PM
5743 - Install New Internal Battery
Instruction
Published
11/03/2022 12:48 PM
5734 - 5733 - Set new battery in place; Remark:5732
Procedure Step
Published
11/03/2022 12:51 PM
5733 - Set new battery in place
Instruction
Published
11/03/2022 12:49 PM
5732 - Align the new battery on the circuit board. Verify wiring connectors are in t...
Remark
Published
11/03/2022 12:51 PM
5735 - 5731 - Secure battery to circuit board; Remark:5730
Procedure Step
Published
11/03/2022 12:55 PM
5731 - Secure battery to circuit board
Instruction
Published
11/03/2022 12:52 PM
5730 - Use two (2) wire ties. Cut excess wire tie.
Remark
Published
11/03/2022 12:54 PM
5736 - 5729 - Attach padded foam to new battery; Remark:5728
Procedure Step
Published
11/03/2022 12:57 PM
5729 - Attach padded foam to new battery
Instruction
Published
11/03/2022 12:55 PM
5728 - If the old pad is not reusable, it is recommended to use a new piece.
Remark
Published
11/03/2022 12:57 PM
5737 - 5726 - Remove existing connector (if needed); Remark:5725
Procedure Step
Published
11/03/2022 1:02 PM
5727 - Caution : Only cut one wire at a time.
Annotation
Published
11/03/2022 1:02 PM
5726 - Remove existing connector (if needed)
Instruction
Published
11/03/2022 12:58 PM
5725 - The existing connector might need to be removed. Make sure enough wire is ava...
Remark
Published
11/03/2022 1:01 PM
5738 - 1821 - Connect battery; Remark:5724
Procedure Step
Published
11/03/2022 1:05 PM
1821 - Connect battery
Instruction
Published
11/20/2020 9:26 AM
5724 - Use wire crimpers to attach insulated female spade quick connectors.
Remark
Published
11/03/2022 1:05 PM
5739 - 5723 - Check connections; Remark:5722
Procedure Step
Published
11/03/2022 1:11 PM
5553 - Caution : Correct placement of connectors and wiring is critical to proper operation.
Annotation
Published
10/28/2022 2:19 PM
5723 - Check connections
Instruction
Published
11/03/2022 1:07 PM
5722 - The ground wire (usually black) must be connected to the terminal closest to ...
Remark
Published
11/03/2022 1:10 PM
5740 - 5720 - Replace electronics; Remark:5719
Procedure Step
Published
11/03/2022 1:15 PM
5721 - Caution : Circuit board must be inserted correctly to prevent damage to components....
Annotation
Published
11/03/2022 1:15 PM
5720 - Replace electronics
Instruction
Published
11/03/2022 1:11 PM
5719 - Align circuit board with third slot from bottom of enclosure and slide into p...
Remark
Published
11/03/2022 1:15 PM
5741 - 5718 - Align gasket; Remark:5717
Procedure Step
Published
11/03/2022 1:18 PM
5718 - Align gasket
Instruction
Published
11/03/2022 1:16 PM
5717 - Verify gasket is aligned between housing and end panel before inserting screw...
Remark
Published
11/03/2022 1:18 PM
5742 - 5716 - Reinstall two (2) enclosure screws; Remark:5714
Procedure Step
Published
11/03/2022 1:22 PM
5716 - Reinstall two (2) enclosure screws
Instruction
Published
11/03/2022 1:19 PM
5714 - Use T-10 Torx screwdriver.
Remark
Published
11/03/2022 1:20 PM
5780 - 5779 - Reinstall Power Supply Module; Remark:
Procedure Step
Published
11/03/2022 1:25 PM
5779 - Reinstall Power Supply Module
Instruction
Published
11/03/2022 1:25 PM
5776 - 5775 - Secure power supply module to FHT 681; Remark:5774
Procedure Step
Published
11/03/2022 2:50 PM
5775 - Secure power supply module to FHT 681
Instruction
Published
11/03/2022 2:46 PM
5774 - The module will snap into place.
Remark
Published
11/03/2022 2:50 PM
5777 - 5773 - Reconnect battery cable; Remark:5772
Procedure Step
Published
11/03/2022 2:55 PM
5773 - Reconnect battery cable
Instruction
Published
11/03/2022 2:51 PM
5772 - Align the connector and push in. Rotate collar clockwise and hand-tighten.
Remark
Published
11/03/2022 2:55 PM
5778 - 5771 - Install wire ties; Remark:5769
Procedure Step
Published
11/03/2022 3:06 PM
5771 - Install wire ties
Instruction
Published
11/03/2022 2:56 PM
5769 - If desired, install new wire ties and cut off excess.
Remark
Published
11/03/2022 3:05 PM
5790 - 4237 - Replace distribution box; Remark:4236
Procedure Step
Published
11/03/2022 3:16 PM
4237 - Replace distribution box
Instruction
Published
05/10/2022 2:15 PM
4236 - IO PackEye Distro Box Install
Remark
Published
10/24/2024 6:53 PM
5791 - 5788 - Reconnect Bluetooth adapter cable; Remark:5787
Procedure Step
Published
11/03/2022 3:18 PM
5788 - Reconnect Bluetooth adapter cable
Instruction
Published
11/03/2022 3:17 PM
5787 - IO PackEye Cable for BTA Connect
Remark
Published
11/09/2024 8:13 PM
5792 - 5786 - Reconnect RS232 jumper; Remark:5785
Procedure Step
Published
11/03/2022 3:42 PM
5786 - Reconnect RS232 jumper
Instruction
Published
11/03/2022 3:39 PM
5785 - Use small, slotted screwdriver to secure connector.
Remark
Published
11/16/2022 9:35 AM
5830 - IO PackEye RS232 Connect Cable
Remark
Published
11/09/2024 8:14 PM
5763 - 5762 - Check Battery Charging; Remark:
Procedure Step
Published
11/03/2022 2:48 PM
5762 - Check Battery Charging
Instruction
Published
11/03/2022 2:48 PM
5798 - 4718 - Connect charger; Remark:5797
Procedure Step
Published
11/03/2022 3:57 PM
4718 - Connect charger
Instruction
Published
06/29/2022 1:15 PM
5797 - IO PackEye Battery Charger Connection
Remark
Published
11/09/2024 8:15 PM
5807 - IO PackEye Battery Connect Cable
Remark
Published
11/09/2024 8:15 PM
5799 - 4716 - Verify instrument is charging; Remark:5752
Procedure Step
Published
11/03/2022 4:01 PM
4716 - Verify instrument is charging
Instruction
Published
06/29/2022 1:16 PM
5752 - CHARGE (yellow) and READY (green) LEDs will...
Remark
Published
11/10/2022 9:17 AM
5800 - 5796 - Charge Instrument; Remark:5795
Procedure Step
Published
11/03/2022 4:04 PM
5796 - Charge Instrument
Instruction
Published
11/03/2022 4:02 PM
5795 - It is recommended to fully charge the battery before first use. Only the gree...
Remark
Published
11/03/2022 4:04 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
minutes
Duration
Published
05/26/2022 11:41 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Technician 3
Skill Level
Published
05/14/2020 2:56 PM
Small slotted (flathead) screwdriver
Tools
Published
09/11/2020 11:23 AM
Wire cutter pliers
Tools
Published
10/27/2022 1:20 PM
T10 Torx screwdriver
Tools
Published
11/10/2022 12:57 PM
Medium pliers
Tools
Published
11/03/2022 2:20 PM
Wire Crimpers
Tools
Published
11/03/2022 4:56 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_distrobox_remove.jpg
Image
Published
10/20/2023 4:00 PM
packeye_di_batterycable_remove.jpg
Image
Published
10/20/2023 3:54 PM
packeye_di_batterycable_2prong.jpg
Image
Published
10/20/2023 3:51 PM
packeye_di_rs232cable_remove.jpg
Image
Published
10/23/2023 9:49 AM
packeye_di_rs232btadisconnect.jpg
Image
Published
10/23/2023 1:46 PM
packeye_di_powercable_ties_locate.jpg
Image
Published
10/20/2023 4:02 PM
packeye_di_powermodule_remove.jpg
Image
Published
10/20/2023 4:04 PM
packeye_di_powersupp_screws.jpg
Image
Published
10/23/2023 1:47 PM
packeye_di_powersupp_slideopen.jpg
Image
Published
10/23/2023 1:48 PM
packeye_di_power_battery_disconnect.jpg
Image
Published
10/24/2023 3:21 PM
packeye_di_battery_cutties.jpg
Image
Published
10/23/2023 2:19 PM
packeye_di_battery_removefoam.jpg
Image
Published
10/23/2023 2:22 PM
packeye_di_battery_installties.jpg
Image
Published
10/23/2023 2:25 PM
packeye_di_battery_installfoam.jpg
Image
Published
10/23/2023 2:23 PM
packeye_di_battery_cutwires.jpg
Image
Published
10/23/2023 2:21 PM
packeye_di_battery_installspade.jpg
Image
Published
10/23/2023 2:24 PM
packeye_di_powersupp_spadeon.jpg
Image
Published
10/23/2023 1:54 PM
packeye_di_powersupp_alignslot3.jpg
Image
Published
10/23/2023 1:55 PM
packeye_di_powersupp_slideclosed.jpg
Image
Published
10/23/2023 1:49 PM
packeye_di_powermodule_install.jpg
Image
Published
10/20/2023 4:03 PM
packeye_di_batterycable_install.jpg
Image
Published
10/20/2023 3:53 PM
packeye_di_distrobox_install.jpg
Image
Published
10/20/2023 3:59 PM
packeye_di_rs232btaconnectinsert.jpg
Image
Published
10/23/2023 1:44 PM
packeye_di_rs232cable_insert.jpg
Image
Published
10/23/2023 9:48 AM
packeye_di_battery_chargerconnector.jpg
Image
Published
10/23/2023 2:17 PM
packeye_di_charger_connect_redarrow_00783.jpg
Image
Published
10/20/2023 12:53 PM
packeye_di_batteryCHARGING_0.jpg
Image
Published
10/23/2023 1:43 PM
packeye_di_batteryREADY.jpg
Image
Published
10/23/2023 9:34 AM

PackEye Backup Battery

Last Updated: 05/03/2025 1:40 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
4193 - 4192 - Charge backup battery; Remark:4207
Procedure Step
Published
05/10/2022 1:42 PM
4192 - Charge backup battery
Instruction
Published
05/10/2022 1:42 PM
4207 - The backup battery and charger are included in the PackEye accessory case. Ba...
Remark
Published
05/10/2022 1:50 PM
4203 - 4202 - Disconnect Primary Battery; Remark:
Procedure Step
Published
05/10/2022 1:44 PM
4202 - Disconnect Primary Battery
Instruction
Published
05/10/2022 1:44 PM
3869 - 313 - Power off instrument; Remark:3850
Procedure Step
Published
03/29/2022 2:23 AM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
3850 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
03/29/2022 1:38 AM
4223 - 4222 - Place instrument on flat surface; Remark:4221
Procedure Step
Published
05/10/2022 1:56 PM
4222 - Place instrument on flat surface
Instruction
Published
05/10/2022 1:54 PM
4221 - Shoulder straps should be facing down.
Remark
Published
05/10/2022 1:55 PM
3926 - 3876 - Open top of backpack; Remark:3928
Procedure Step
Published
04/05/2022 5:28 PM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
3928 - IO PackEye Open Top of Backpack for Battery Access
Remark
Published
10/24/2024 6:52 PM
4224 - 4219 - Remove distribution box; Remark:4218
Procedure Step
Published
05/10/2022 1:59 PM
4220 - Note : The distribution box is usually in the top of the backpack. On some models, i...
Annotation
Published
05/10/2022 1:59 PM
4219 - Remove distribution box
Instruction
Published
05/10/2022 1:58 PM
4218 - The distribution box is usually located in the top of the backpack.
Remark
Published
05/10/2022 1:58 PM
4225 - 4217 - Disconnect battery cable; Remark:4216
Procedure Step
Published
05/10/2022 2:03 PM
4217 - Disconnect battery cable
Instruction
Published
05/10/2022 2:01 PM
4216 - Rotate the collar counterclockwise and pull straight out. The battery cable c...
Remark
Published
05/10/2022 2:03 PM
4201 - 4200 - Connect Spare Battery; Remark:
Procedure Step
Published
05/10/2022 1:45 PM
4200 - Connect Spare Battery
Instruction
Published
05/10/2022 1:45 PM
4232 - 4231 - Connect backup battery to adapter cable; Remark:4230
Procedure Step
Published
05/17/2022 10:09 AM
4249 - Note : Backup battery should be charged prior to installation.
Annotation
Published
05/17/2022 10:06 AM
4231 - Connect backup battery to adapter cable
Instruction
Published
05/10/2022 2:08 PM
4230 - The adapter cable is included in the PackEye accessory case. The cable might ...
Remark
Published
05/10/2022 2:10 PM
4233 - 4228 - Connect adapter cable to distribution box; Remark:4227
Procedure Step
Published
05/10/2022 2:13 PM
4229 - Caution : Align connectors first. Do not use excessive force to push connectors togethe...
Annotation
Published
05/10/2022 2:13 PM
4228 - Connect adapter cable to distribution box
Instruction
Published
05/10/2022 2:11 PM
4227 - Align connectors. Push connectors together. Rotate collar clockwise.
Remark
Published
05/10/2022 2:12 PM
4199 - 4198 - Repack Instrument; Remark:
Procedure Step
Published
05/10/2022 1:46 PM
4198 - Repack Instrument
Instruction
Published
05/10/2022 1:46 PM
4238 - 4237 - Replace distribution box; Remark:4236
Procedure Step
Published
05/10/2022 2:17 PM
4237 - Replace distribution box
Instruction
Published
05/10/2022 2:15 PM
4236 - IO PackEye Distro Box Install
Remark
Published
10/24/2024 6:53 PM
4239 - 4235 - Place backup battery in top pocket of backpack; Remark:4234
Procedure Step
Published
05/10/2022 2:19 PM
4235 - Place backup battery in top pocket of backpack
Instruction
Published
05/10/2022 2:18 PM
4234 - IO PackEye Backup Battery in Pocket
Remark
Published
10/24/2024 6:54 PM
4240 - 1383 - Close backpack; Remark:
Procedure Step
Published
05/10/2022 2:21 PM
1383 - Close backpack
Instruction
Published
11/19/2020 5:23 PM
3852 - 220 - Power on instrument; Remark:3836
Procedure Step
Published
03/29/2022 1:59 AM
220 - Power on instrument
Instruction
Published
04/06/2025 7:00 PM
3836 - Press power button on the indicator unit for approximately 1 second.
Remark
Published
03/29/2022 1:05 AM
Operator Procedure
Document Type
Published
03/02/2020 3:31 PM
minutes
Duration
Published
05/26/2022 11:41 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
None
Tools
Published
05/06/2020 9:50 PM
packeye_di_backupbattery_oncharger.jpg
Image
Published
10/20/2023 3:50 PM
packeye_di_ansmanncharger.jpg
Image
Published
10/20/2023 3:47 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_distrobox_remove.jpg
Image
Published
10/20/2023 4:00 PM
packeye_di_batterycable_remove.jpg
Image
Published
10/20/2023 3:54 PM
packeye_di_batterycable_2prong.jpg
Image
Published
10/20/2023 3:51 PM
packeye_di_batterycable_adapter.jpg
Image
Published
10/20/2023 3:52 PM
packeye_di_backupbattery_connect_adapter.jpg
Image
Published
10/20/2023 3:49 PM
packeye_di_batterycable_install.jpg
Image
Published
10/20/2023 3:53 PM
packeye_di_distrobox_install.jpg
Image
Published
10/20/2023 3:59 PM
packeye_di_backupbattery_pocket.jpg
Image
Published
10/20/2023 3:50 PM
packeye_ui_power_on_00719
Image
Published
02/07/2022 1:46 AM

PackEye Trimble Pairing

Last Updated: 05/03/2025 1:40 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
3923 - 3874 - Check Equipment; Remark:
Procedure Step
Published
04/05/2022 2:22 PM
3874 - Check Equipment
Instruction
Published
04/04/2022 3:12 PM
3869 - 313 - Power off instrument; Remark:3850
Procedure Step
Published
03/29/2022 2:23 AM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
3850 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
03/29/2022 1:38 AM
3926 - 3876 - Open top of backpack; Remark:3928
Procedure Step
Published
04/05/2022 5:28 PM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
3928 - IO PackEye Open Top of Backpack for Battery Access
Remark
Published
10/24/2024 6:52 PM
4178 - 3877 - Verify connections; Remark:3900
Procedure Step
Published
05/10/2022 11:17 AM
4132 - Caution : Do not plug RS232 interconnect cable into lower connectors on the FHT 681 amp...
Annotation
Published
05/03/2022 4:16 PM
3877 - Verify connections
Instruction
Published
04/04/2022 3:14 PM
3900 - The RS232 interconnect cable from the power module should be connected to the...
Remark
Published
04/06/2022 2:17 PM
3930 - 3878 - Verify RS232 BT adapter and cable are connected; Remark:3901
Procedure Step
Published
04/06/2022 8:37 AM
3878 - Verify RS232 BT adapter and cable are connected
Instruction
Published
04/04/2022 3:15 PM
3901 - The RS232 BT adapter cable connects to the power supply module.
Remark
Published
04/06/2022 2:19 PM
4190 - 4179 - Verify BT adapter is correct; Remark:4164
Procedure Step
Published
05/10/2022 1:41 PM
3894 - Note : Several BT Adapters have been deployed with the PackEye for wireless operatio...
Annotation
Published
04/04/2022 4:34 PM
4179 - Verify BT adapter is correct
Instruction
Published
05/10/2022 1:28 PM
4164 - The Trimble only communicates with the LM Technologies LM048 BT adapter. ...
Remark
Published
05/06/2022 3:35 PM
4191 - 4180 - Verify BT adapter is in DTE mode; Remark:4165
Procedure Step
Published
05/10/2022 1:42 PM
4133 - Caution : Do not push Reset button. This will reprogram the BT adapter...
Annotation
Published
05/03/2022 4:19 PM
4180 - Verify BT adapter is in DTE mode
Instruction
Published
05/18/2022 1:49 PM
4165 - The switch might be covered with a sticker or label. If so, the switch should...
Remark
Published
05/06/2022 3:37 PM
4195 - 3882 - Document BT adapter serial number; Remark:4166
Procedure Step
Published
05/10/2022 1:43 PM
3882 - Document BT adapter serial number
Instruction
Published
04/04/2022 3:24 PM
4166 - The serial number is located on the bottom of the BT adapter.
Remark
Published
05/06/2022 3:38 PM
3925 - 3883 - Power on Equipment; Remark:
Procedure Step
Published
04/05/2022 2:30 PM
3896 - Note : It is best practice to only have one PackEye powered on at a time to minimize...
Annotation
Published
04/04/2022 4:36 PM
3883 - Power on Equipment
Instruction
Published
04/04/2022 3:25 PM
3852 - 220 - Power on instrument; Remark:3836
Procedure Step
Published
03/29/2022 1:59 AM
220 - Power on instrument
Instruction
Published
04/06/2025 7:00 PM
3836 - Press power button on the indicator unit for approximately 1 second.
Remark
Published
03/29/2022 1:05 AM
4196 - 3884 - Verify BT adapter lights are active; Remark:4167
Procedure Step
Published
05/10/2022 1:44 PM
3884 - Verify BT adapter lights are active
Instruction
Published
04/04/2022 3:26 PM
4167 - There will be a solid red power light and a flashing blue (Bluetooth) light.
Remark
Published
05/06/2022 3:41 PM
4197 - 1495 - Power on mobile device; Remark:4060
Procedure Step
Published
04/07/2025 1:51 PM
1495 - Power on mobile device
Instruction
Published
11/12/2020 4:20 PM
4060 - The display may take 2 to 3 seconds to appear.
Remark
Published
05/13/2022 11:40 AM
4061 - The PackEye software should start automatically. If it does not, use the styl...
Remark
Published
05/03/2022 11:23 AM
4096 - 4051 - Tap ok on popup message; Remark:4126
Procedure Step
Published
05/03/2022 11:27 AM
4051 - Tap ok on popup message
Instruction
Published
05/02/2022 10:25 AM
4126 - IO PackEye OK to proceed
Remark
Published
11/16/2024 8:52 PM
4127 - 3887 - Pair with BT Adapter; Remark:
Procedure Step
Published
05/03/2022 3:02 PM
3887 - Pair with BT Adapter
Instruction
Published
04/04/2022 3:28 PM
4205 - 4181 - Navigate to S1 tab; Remark:4168
Procedure Step
Published
05/10/2022 1:50 PM
4181 - Navigate to S1 tab
Instruction
Published
05/18/2022 1:48 PM
4168 - Use stylus to tap the right arrow. Select S1
Remark
Published
05/06/2022 3:43 PM
4206 - 4182 - Tap Search BT Devices; Remark:4169
Procedure Step
Published
05/10/2022 1:51 PM
4182 - Tap Search BT Devices
Instruction
Published
05/18/2022 1:47 PM
4169 - IO PackEye Trimble Search BT Devices Button
Remark
Published
05/06/2022 3:45 PM
4208 - 3889 - Select BT adapter; Remark:4170
Procedure Step
Published
05/10/2022 1:53 PM
4134 - Note : If multiple PackEye units with BT adapters are nearby, they might appear in t...
Annotation
Published
05/03/2022 4:22 PM
3889 - Select BT adapter
Instruction
Published
04/04/2022 3:30 PM
4170 - Tap dropdown arrow. Tap on BT Adapter serial number located earlier.
Remark
Published
05/06/2022 3:46 PM
4209 - 4183 - Verify successful selection; Remark:4171
Procedure Step
Published
05/10/2022 1:54 PM
4183 - Verify successful selection
Instruction
Published
05/10/2022 1:31 PM
4171 - The dropdown box will have blue shading.
Remark
Published
05/06/2022 3:47 PM
4210 - 4184 - Verify FHT681 active is checked; Remark:4172
Procedure Step
Published
05/10/2022 1:55 PM
4184 - Verify FHT681 active is checked
Instruction
Published
05/18/2022 1:47 PM
4172 - IO PackEye Trimble FHT681 Active Setting
Remark
Published
05/06/2022 3:49 PM
4211 - 4185 - Verify GPS active is checked; Remark:4173
Procedure Step
Published
05/10/2022 1:56 PM
4185 - Verify GPS active is checked
Instruction
Published
05/18/2022 1:46 PM
4173 - IO PackEye Trimble GPS Active Setting
Remark
Published
05/06/2022 3:50 PM
4212 - 4186 - Tap Save; Remark:4174
Procedure Step
Published
05/10/2022 2:01 PM
4186 - Tap Save
Instruction
Published
05/18/2022 1:46 PM
4174 - IO PackEye Trimble Save Settings Button
Remark
Published
05/06/2022 3:51 PM
3941 - 3891 - Verify Connection; Remark:
Procedure Step
Published
04/06/2022 3:54 PM
3891 - Verify Connection
Instruction
Published
04/04/2022 3:31 PM
4213 - 4187 - Navigate to Rates tab; Remark:4175
Procedure Step
Published
05/10/2022 2:02 PM
4187 - Navigate to Rates tab
Instruction
Published
05/18/2022 1:45 PM
4175 - Use the stylus to press the left arrow, selecting the Rates ...
Remark
Published
05/06/2022 3:53 PM
4214 - 4052 - Tap Start; Remark:4125
Procedure Step
Published
05/10/2022 2:02 PM
4052 - Tap Start
Instruction
Published
05/02/2022 10:26 AM
4125 - IO PackEye Trimble Start Button in App
Remark
Published
11/16/2024 8:56 PM
4215 - 4188 - Verify BT adapter pairing; Remark:4176
Procedure Step
Published
05/10/2022 2:03 PM
4188 - Verify BT adapter pairing
Instruction
Published
05/10/2022 1:35 PM
4176 - There will be solid red and blue lights and a flashing yellow light.
Remark
Published
05/06/2022 3:54 PM
4226 - 4189 - Verify Trimble is retrieving data; Remark:4163
Procedure Step
Published
05/10/2022 2:04 PM
4189 - Verify Trimble is retrieving data
Instruction
Published
05/10/2022 1:36 PM
4163 - Radiation levels will change every second.
Remark
Published
05/06/2022 12:59 PM
253 - 242 - Document and report any unresolved problems; Remark:
Procedure Step
Published
06/22/2021 10:23 AM
242 - Document and report any unresolved problems
Instruction
Published
04/21/2025 11:45 AM
Operator Procedure
Document Type
Published
03/02/2020 3:31 PM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Trimble Juno
Tools
Published
04/28/2022 12:46 PM
BT adapter
Tools
Published
04/28/2022 12:46 PM
RS232 BT adapter cable
Tools
Published
04/28/2022 12:46 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_rs232atfht681_redbox_00759.jpg
Image
Published
10/20/2023 12:56 PM
packeye_di_rs232cable_redoval_00760.jpg
Image
Published
10/20/2023 12:58 PM
packeye_di_rs232btaconnect_redbox_00761.jpg
Image
Published
10/20/2023 12:57 PM
packeye_di_bta_lm048_redbox.jpg
Image
Published
10/20/2023 3:57 PM
packeye_di_dteswitch_lm048_redarrow.jpg
Image
Published
10/20/2023 4:01 PM
packeye_di_bta_serialnumb3_redbox.jpg
Image
Published
10/20/2023 3:58 PM
packeye_ui_power_on_00719
Image
Published
02/07/2022 1:46 AM
packeye_di_bta_lm680_active_redbox_00770.jpg
Image
Published
10/20/2023 10:52 AM
packeye_di_trmb_pwrbutton_redcircle.jpg
Image
Published
10/20/2023 4:38 PM
packeye_ui_trmb_pda681app.jpg
Image
Published
10/23/2023 9:08 AM
packeye_ui_trmb_oktoproceed.jpg
Image
Published
10/20/2023 4:41 PM
packeye_ui_trmb_set_arrows1.jpg
Image
Published
10/20/2023 4:26 PM
packeye_ui_trmb_set_bta_search.jpg
Image
Published
10/20/2023 4:24 PM
packeye_ui_trmb_set_bta_serialnumber.jpg
Image
Published
10/20/2023 4:23 PM
packeye_ui_trmb_set_btablue.jpg
Image
Published
10/20/2023 4:21 PM
packeye_ui_trmb_set_activefht.jpg
Image
Published
10/20/2023 4:20 PM
packeye_ui_trmb_set_activegps.jpg
Image
Published
10/20/2023 4:18 PM
packeye_ui_trmb_set_save.jpg
Image
Published
10/20/2023 4:16 PM
packeye_ui_trmb_ratesbtn__noconnect_full.jpg
Image
Published
10/20/2023 4:13 PM
packeye_ui_trmb_startbtn_full.jpg
Image
Published
10/23/2023 9:06 AM
packeye_di_bta_lm048_active_yellow_redbox.jpg
Image
Published
10/20/2023 3:55 PM
packeye_ui_trmb_rates_G0,074.jpg
Image
Published
10/23/2023 9:04 AM
packeye_ui_trmb_graph_fluc_lrgbox.jpg
Image
Published
10/23/2023 9:03 AM

PackEye Operational Test

Last Updated: 05/03/2025 1:40 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
247 - 257 - Prepare instrument; Remark:
Procedure Step
Published
04/11/2025 9:08 PM
257 - Prepare instrument
Instruction
Published
04/11/2025 9:07 PM
786 - 219 - Verify there are no sources of radiation near instrument; Remark:7
Procedure Step
Published
04/20/2025 6:37 PM
219 - Verify there are no sources of radiation near instrument
Instruction
Published
04/12/2025 4:20 PM
7 - No Radiation symbol
Remark
Published
07/12/2021 1:34 PM
3852 - 220 - Power on instrument; Remark:3836
Procedure Step
Published
03/29/2022 1:59 AM
220 - Power on instrument
Instruction
Published
04/06/2025 7:00 PM
3836 - Press power button on the indicator unit for approximately 1 second.
Remark
Published
03/29/2022 1:05 AM
3853 - 612 - Wait for instrument to complete start-up sequence; Remark:3837
Procedure Step
Published
04/13/2025 6:49 PM
612 - Wait for instrument to complete start-up sequence
Instruction
Published
04/13/2025 6:38 PM
3837 - Initialization and background measurement may take about 20 seconds. During t...
Remark
Published
03/29/2022 1:08 AM
3854 - 3825 - Verify instrument is ready; Remark:3838
Procedure Step
Published
03/29/2022 2:01 AM
3825 - Verify instrument is ready
Instruction
Published
03/28/2022 6:15 PM
3838 - The flashing green nat light indicates PackEye is ready for ...
Remark
Published
03/29/2022 1:10 AM
3855 - 3826 - Verify fail light is off; Remark:3839
Procedure Step
Published
03/29/2022 2:02 AM
3826 - Verify fail light is off
Instruction
Published
03/28/2022 6:16 PM
3839 - Solid yellow light: neutron detector or electronic failure.
Remark
Published
03/29/2022 1:12 AM
3840 - Flashing yellow light: high gamma radiation level or gamma detector failure.
Remark
Published
03/29/2022 1:13 AM
3856 - 1437 - Verify Response to Gamma Source; Remark:
Procedure Step
Published
03/29/2022 2:03 AM
1437 - Verify Response to Gamma Source
Instruction
Published
09/01/2020 7:45 PM
3857 - 3827 - Select Alarm mode; Remark:3841
Procedure Step
Published
03/29/2022 2:04 AM
3827 - Select Alarm mode
Instruction
Published
03/28/2022 6:17 PM
3841 - The green LED is off. Briefly press power button to change modes.
Remark
Published
03/29/2022 1:15 AM
3858 - 3828 - Place gamma source on instrument; Remark:3842
Procedure Step
Published
03/29/2022 2:05 AM
3828 - Place gamma source on instrument
Instruction
Published
03/28/2022 6:18 PM
3842 - IO PackEye Gamma Source Placed
Remark
Published
03/29/2022 1:23 AM
3859 - 1439 - Verify instrument responds to radioactive source; Remark:3843
Procedure Step
Published
03/29/2022 2:06 AM
1439 - Verify instrument responds to radioactive source
Instruction
Published
06/29/2022 11:50 PM
3843 - Additional gamma indicator lights will illuminate on indicator unit and an au...
Remark
Published
03/29/2022 1:22 AM
3860 - 3829 - Acknowledge gamma alarm; Remark:3844
Procedure Step
Published
03/29/2022 2:07 AM
3829 - Acknowledge gamma alarm
Instruction
Published
03/28/2022 6:20 PM
3844 - Briefly press gamma button to acknowledge alarm.
Remark
Published
03/29/2022 1:25 AM
3835 - 3830 - Move source away from instrument; Remark:246
Procedure Step
Published
03/28/2022 6:31 PM
3830 - Move source away from instrument
Instruction
Published
03/28/2022 6:20 PM
246 - IO No source trefoil
Remark
Published
10/07/2024 11:39 AM
3861 - 3831 - Select Chirper mode; Remark:3845
Procedure Step
Published
03/29/2022 2:08 AM
3831 - Select Chirper mode
Instruction
Published
03/28/2022 6:21 PM
3845 - The green LED is on. Briefly press power button to change modes.
Remark
Published
03/29/2022 1:26 AM
3871 - 3828 - Place gamma source on instrument; Remark:3842
Procedure Step
Published
04/04/2022 11:00 AM
3862 - 1439 - Verify instrument responds to radioactive source; Remark:3846
Procedure Step
Published
03/29/2022 2:09 AM
3846 - Additional gamma indicator lights will illuminate. Audible chirper pitch will...
Remark
Published
03/29/2022 1:28 AM
3872 - 3830 - Move source away from instrument; Remark:246
Procedure Step
Published
04/04/2022 11:00 AM
3863 - 3832 - Verify Response to Neutron Source; Remark:
Procedure Step
Published
03/29/2022 2:10 AM
3832 - Verify Response to Neutron Source
Instruction
Published
03/29/2022 2:56 AM
3864 - 3827 - Select Alarm mode; Remark:3841
Procedure Step
Published
03/29/2022 2:11 AM
3865 - 3833 - Place neutron source on instrument; Remark:3847
Procedure Step
Published
03/29/2022 2:17 AM
3833 - Place neutron source on instrument
Instruction
Published
03/28/2022 6:24 PM
3847 - IO PackEye Neutron Source Placed
Remark
Published
03/29/2022 1:32 AM
3866 - 1439 - Verify instrument responds to radioactive source; Remark:3848
Procedure Step
Published
03/29/2022 2:19 AM
3848 - Additional neutron indicator lights will illuminate and an alarm will sound. ...
Remark
Published
03/29/2022 1:34 AM
3867 - 3834 - Acknowledge neutron alarm; Remark:3849
Procedure Step
Published
03/29/2022 2:20 AM
3834 - Acknowledge neutron alarm
Instruction
Published
03/28/2022 6:25 PM
3849 - Briefly press neutron button to acknowledge alarm.
Remark
Published
03/29/2022 1:35 AM
3873 - 3833 - Place neutron source on instrument; Remark:3847
Procedure Step
Published
04/04/2022 11:15 AM
3868 - 1439 - Verify instrument responds to radioactive source; Remark:3851
Procedure Step
Published
04/04/2022 11:03 AM
3851 - Additional neutron indicator lights will illuminate and an alarm will sound. ...
Remark
Published
04/01/2022 1:26 PM
3869 - 313 - Power off instrument; Remark:3850
Procedure Step
Published
03/29/2022 2:23 AM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
3850 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
03/29/2022 1:38 AM
253 - 242 - Document and report any unresolved problems; Remark:
Procedure Step
Published
06/22/2021 10:23 AM
242 - Document and report any unresolved problems
Instruction
Published
04/21/2025 11:45 AM
Routine Maintenance Procedure
Document Type
Published
03/02/2020 3:31 PM
10 minutes
Duration
Published
04/01/2020 11:35 AM
Annually
Frequency
Published
04/01/2020 11:37 AM
Daily
Frequency
Published
04/01/2020 11:36 AM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
None
Tools
Published
05/06/2020 9:50 PM
No Radiation Symbol
Image
Published
08/13/2024 2:56 PM
packeye_ui_power_on_00719
Image
Published
02/07/2022 1:46 AM
PackEye art light highlighted
Image
Published
02/19/2022 1:48 AM
PackEye Nat light flashing
Image
Published
02/19/2022 1:48 AM
packeye_fail_solid_yellow.jpg
Image
Published
10/20/2023 10:36 AM
packeye_fail_flashing_yellow.jpg
Image
Published
10/20/2023 10:36 AM
Alarm mode
Image
Published
02/19/2022 1:48 AM
packeye_radsource_placeright.jpg
Image
Published
10/20/2023 10:46 AM
packeye_gamma_radsource_indicator.jpg
Image
Published
10/20/2023 10:39 AM
Packeye acknowledge gamma alarm
Image
Published
02/19/2022 1:48 AM
Chirper mode
Image
Published
02/19/2022 1:48 AM
packeye_gamma_radsource_chirp.jpg
Image
Published
10/20/2023 10:38 AM
packeye_neutronradsource_placeright.jpg
Image
Published
10/20/2023 10:45 AM
packeye_neutron_radsource_indicator.jpg
Image
Published
10/20/2023 10:44 AM
Acknowledge_neutron.png
Image
Published
02/19/2022 1:48 AM
packeye_neutron_radsource_chirp.jpg
Image
Published
10/20/2023 10:43 AM
Power off Packeye
Image
Published
02/19/2022 1:48 AM

PRM-470 Computer Connection

Last Updated: 05/03/2025 1:37 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Rapiscan PRM-470 CG
Device
Published
10/28/2024 3:40 PM
Rapiscan PRM-470 CGN
Device
Published
10/28/2024 3:33 PM
534 - 508 - Verify PRMCOM software is installed; Remark:517
Procedure Step
Published
07/20/2021 11:58 AM
516 - Note : PRM-470 Communications Software is referred to as “PRMCOM”
Annotation
Published
07/26/2021 8:59 AM
508 - Verify PRMCOM software is installed
Instruction
Published
07/16/2021 11:09 AM
517 - PRMCOM software is included with the PRM-470. Run setup file (“prm-470c_com...
Remark
Published
07/16/2021 11:16 AM
533 - 509 - Verify USB-serial adapter drivers are installed; Remark:518
Procedure Step
Published
07/20/2021 11:59 AM
509 - Verify USB-serial adapter drivers are installed
Instruction
Published
07/16/2021 11:10 AM
518 - Drivers are generally included on with a USB/Serial adapter or installed auto...
Remark
Published
07/16/2021 11:17 AM
532 - 510 - Connect PRM-470 to computer; Remark:519
Procedure Step
Published
07/20/2021 11:59 AM
510 - Connect PRM-470 to computer
Instruction
Published
07/16/2021 11:11 AM
519 - Use USB/Serial adapter and serial cable to connect PRM-470 to a computer....
Remark
Published
07/16/2021 11:17 AM
531 - 511 - Determine USB Serial Port COM number; Remark:520
Procedure Step
Published
07/20/2021 12:00 PM
511 - Determine USB Serial Port COM number
Instruction
Published
07/16/2021 11:11 AM
520 - The COM port number may be found by expanding Ports in the computer’s Devic...
Remark
Published
07/26/2021 9:02 AM
530 - 512 - Start PRMCOM software; Remark:521
Procedure Step
Published
07/20/2021 12:00 PM
512 - Start PRMCOM software
Instruction
Published
07/16/2021 11:12 AM
521 - Double-clicking on the program icon on the desktop.
Remark
Published
07/16/2021 11:19 AM
529 - 513 - Select the Comm Port; Remark:522
Procedure Step
Published
07/20/2021 12:01 PM
513 - Select the Comm Port
Instruction
Published
07/16/2021 11:13 AM
522 - Use Comm port number listed in Device Manager previously.
Remark
Published
07/16/2021 11:19 AM
528 - 514 - Click Connect; Remark:523
Procedure Step
Published
07/29/2021 11:36 AM
514 - Click Connect
Instruction
Published
07/29/2021 11:34 AM
523 - IO PRMCOM Connect Button for COM Port
Remark
Published
11/06/2024 7:47 PM
525 - 515 - Verify successful communication; Remark:524
Procedure Step
Published
07/20/2021 12:02 PM
515 - Verify successful communication
Instruction
Published
07/16/2021 11:15 AM
524 - If Comm Port is correct, PRM-470 screen will briefly flash message "Sent Para...
Remark
Published
07/29/2021 3:56 PM
526 - PRMCOM Parameters will be filled with values obtained from PRM-470.
Remark
Published
07/06/2021 1:13 PM
253 - 242 - Document and report any unresolved problems; Remark:
Procedure Step
Published
06/22/2021 10:23 AM
242 - Document and report any unresolved problems
Instruction
Published
04/21/2025 11:45 AM
Routine Maintenance Procedure
Document Type
Published
03/02/2020 3:31 PM
10 minutes
Duration
Published
04/01/2020 11:35 AM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Technician 2
Skill Level
Published
04/09/2020 1:17 AM
Computer with Rapiscan PRMCOM software and USB [universal serial bus]/Serial adapter drivers
Tools
Published
07/06/2021 11:38 AM
USB/Serial adapter
Tools
Published
05/09/2020 4:02 PM
Serial cable
Tools
Published
05/10/2020 9:04 PM
PRMCOM_Logo_Desktop.png
Image
Published
07/07/2021 2:50 AM
PRM-470_Full_Laptop_Connected
Image
Published
02/19/2023 11:28 AM
Computer Device Manager Select COM Port
Image
Published
05/13/2020 11:40 AM
PRMCOM Comm Port Selection on Config Tab
Image
Published
05/11/2020 3:55 PM
PRMCOM Connect Button after Comm Port Selection on Config Tab
Image
Published
07/29/2021 12:10 PM
PRM-470 Display Sent Parameters Message
Image
Published
05/11/2020 4:11 PM
PRM-470_Parameters_Values.png
Image
Published
07/07/2021 2:50 AM