Rapiscan CM-267 Conveyor Monitor |
Device
|
Published
|
06/27/2024 1:02 PM
|
Rapiscan PM-700 Pedestrian Monitor |
Device
|
Published
|
06/20/2024 11:38 AM
|
Rapiscan TM-850 Rail Monitor |
Device
|
Published
|
09/18/2024 10:28 AM
|
Rapiscan VM-250 Vehicle Monitor |
Device
|
Published
|
10/14/2024 9:50 AM
|
7264 - 1401 - Establish Initial Conditions; Remark: |
Procedure Step
|
Published
|
04/27/2023 7:00 PM
|
1401 - Establish Initial Conditions |
Instruction
|
Published
|
09/30/2022 3:14 PM
|
7622 - 7592 - Inform system operators; Remark:11335 |
Procedure Step
|
Published
|
04/20/2025 10:15 AM
|
7592 - Inform system operators |
Instruction
|
Published
|
06/29/2023 3:20 PM
|
11335 - Upon arrival, brief system operators on expected work, duration, anticipated ... |
Remark
|
Published
|
04/20/2025 10:14 AM
|
7268 - 7231 - Close lane; Remark:7233 |
Procedure Step
|
Published
|
04/27/2023 7:01 PM
|
9053 - Warning : Traffic should temporarily be rerouted or halted during conduction of this pr... |
Annotation
|
Published
|
09/27/2023 9:09 AM
|
7231 - Close lane |
Instruction
|
Published
|
04/18/2023 1:00 PM
|
7233 - Use orange safety (traffic control) cones to setup barriers. Practice establi... |
Remark
|
Published
|
04/24/2023 12:18 PM
|
7269 - 7232 - Open RPM door; Remark:7234 |
Procedure Step
|
Published
|
04/27/2023 7:02 PM
|
7232 - Open RPM door |
Instruction
|
Published
|
04/18/2023 1:02 PM
|
7234 - Open all doors needed to access components. |
Remark
|
Published
|
04/19/2025 7:48 PM
|
7755 - 7679 - Disconnect Ethernet; Remark:11336 |
Procedure Step
|
Published
|
04/20/2025 11:18 AM
|
7680 - Caution : Make sure to press release button on back of Ethernet cable before removing. |
Annotation
|
Published
|
07/01/2023 11:54 PM
|
7679 - Disconnect Ethernet |
Instruction
|
Published
|
07/01/2023 11:52 PM
|
11336 - Locate Ethernet connector on top of SC-770 controller. Press release button o... |
Remark
|
Published
|
04/20/2025 11:21 AM
|
7270 - 7235 - Power off RPM; Remark:7236 |
Procedure Step
|
Published
|
09/01/2023 7:57 PM
|
7235 - Power off RPM |
Instruction
|
Published
|
04/24/2023 12:30 PM
|
7236 - Move LD-260 switch to OFF position. The PWR ON |
Remark
|
Published
|
04/27/2023 4:25 PM
|
9283 - 8309 - Remove VD-580; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:35 PM
|
8309 - Remove VD-580 |
Instruction
|
Published
|
09/08/2023 2:31 PM
|
9279 - 9207 - Disconnect BNC and MHV cables from VD-580 on top of gamma detector; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:35 PM
|
7792 - Note : It is good engineering practice to ensure all cables and connectors are label... |
Annotation
|
Published
|
07/07/2023 2:17 PM
|
9207 - Disconnect BNC and MHV cables from VD-580 on top of gamma detector |
Instruction
|
Published
|
10/03/2023 10:40 AM
|
9280 - 9208 - Unhook springs from photomultiplier tube ...; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:36 PM
|
9221 - Note : Do not release the springs while they are under tension, the springs may fly ... |
Annotation
|
Published
|
09/29/2023 5:40 PM
|
9208 - Unhook springs from photomultiplier tube (PMT) using needle nose pliers |
Instruction
|
Published
|
10/03/2023 11:57 AM
|
9281 - 9209 - Pull VD-580 off gently to remove from PMT; Remark:9518 |
Procedure Step
|
Published
|
10/02/2023 1:36 PM
|
9209 - Pull VD-580 off gently to remove from PMT |
Instruction
|
Published
|
10/03/2023 11:57 AM
|
9518 - |
Remark
|
Published
|
10/04/2023 10:28 AM
|
9282 - 9210 - Verify VD-580 to be installed is potted; Remark:9218 |
Procedure Step
|
Published
|
10/02/2023 1:37 PM
|
9210 - Verify VD-580 to be installed is potted |
Instruction
|
Published
|
10/03/2023 11:59 AM
|
9218 - Potted version has visible gel coating on circuit board. |
Remark
|
Published
|
10/03/2023 1:21 PM
|
9219 - Potted Version |
Remark
|
Published
|
10/03/2023 1:20 PM
|
9278 - 9211 - Install New VD-580; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:37 PM
|
9211 - Install New VD-580 |
Instruction
|
Published
|
09/29/2023 5:32 PM
|
9275 - 9212 - Line up alignment key and notch between PMT and VD‑580; Remark:9519 |
Procedure Step
|
Published
|
10/02/2023 1:38 PM
|
9212 - Line up alignment key and notch between PMT and VD‑580 |
Instruction
|
Published
|
10/03/2023 12:00 PM
|
9519 - |
Remark
|
Published
|
10/04/2023 10:51 AM
|
9276 - 9213 - Firmly press VD-580 into place on PMT and...; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:38 PM
|
9222 - Note : It may be easier to install the rear spring first. You can install that spring b... |
Annotation
|
Published
|
10/03/2023 10:39 AM
|
9213 - Firmly press VD-580 into place on PMT and reattach springs |
Instruction
|
Published
|
10/03/2023 12:01 PM
|
9277 - 9214 - Reconnect BNC and MHV cables to VD-580; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:38 PM
|
7811 - Caution : Proper connection of cables is critical. |
Annotation
|
Published
|
07/07/2023 9:48 PM
|
9214 - Reconnect BNC and MHV cables to VD-580 |
Instruction
|
Published
|
09/29/2023 5:33 PM
|
7279 - 7249 - Return equipment to normal operating condition; Remark: |
Procedure Step
|
Published
|
04/27/2023 4:13 PM
|
7249 - Return equipment to normal operating condition |
Instruction
|
Published
|
04/08/2025 3:22 PM
|
7280 - 7250 - Power on RPM; Remark:7251 |
Procedure Step
|
Published
|
04/27/2023 4:14 PM
|
7250 - Power on RPM |
Instruction
|
Published
|
05/01/2023 8:31 AM
|
7251 - Move LD-260 switch to ON position. The LED PWR ON |
Remark
|
Published
|
05/10/2023 3:14 PM
|
9272 - 9215 - Verify detector count rate; Remark:9220 |
Procedure Step
|
Published
|
04/20/2025 11:49 AM
|
9215 - Verify detector count rate |
Instruction
|
Published
|
09/29/2023 5:34 PM
|
9220 - Navigate to SHOW COUNTS on SC-770. Enter “Program Mode” by pres... |
Remark
|
Published
|
04/20/2025 11:51 AM
|
7781 - 7730 - Reconnect Ethernet; Remark:7731 |
Procedure Step
|
Published
|
04/20/2025 11:00 AM
|
7730 - Reconnect Ethernet |
Instruction
|
Published
|
07/02/2023 2:34 AM
|
7731 - Insert Ethernet connector at top of SC-770 module. Connector will audibly "cl... |
Remark
|
Published
|
07/02/2023 2:36 AM
|
9273 - 9216 - Reopen RPM Lane; Remark: |
Procedure Step
|
Published
|
10/02/2023 1:40 PM
|
9216 - Reopen RPM Lane |
Instruction
|
Published
|
09/29/2023 5:34 PM
|
7842 - 7820 - Inform system operators upon completion of maintenance action; Remark: |
Procedure Step
|
Published
|
07/07/2023 11:15 PM
|
7820 - Inform system operators upon completion of maintenance action |
Instruction
|
Published
|
07/07/2023 10:02 PM
|
322 - 321 - Document maintenance actions; Remark: |
Procedure Step
|
Published
|
06/17/2021 9:49 AM
|
321 - Document maintenance actions |
Instruction
|
Published
|
04/21/2025 11:19 AM
|
2869 - 2585 - Document maintenance performed; Remark:2866 |
Procedure Step
|
Published
|
06/18/2021 5:58 PM
|
2585 - Document maintenance performed |
Instruction
|
Published
|
07/09/2021 12:15 PM
|
2866 - Record observations, times, and results for the maintenance report. |
Remark
|
Published
|
04/21/2025 11:39 AM
|
4706 - 4705 - Submit report; Remark:4864 |
Procedure Step
|
Published
|
06/29/2022 9:50 AM
|
4705 - Submit report |
Instruction
|
Published
|
06/29/2022 9:50 AM
|
4864 - As specified by management or contractual obligations. |
Remark
|
Published
|
07/28/2022 1:36 PM
|
Corrective Maintenance Procedure |
Document Type
|
Published
|
03/02/2020 3:32 PM
|
10 minutes |
Duration
|
Published
|
04/01/2020 11:35 AM
|
Change from non-potted to potted parts once |
Frequency
|
Published
|
10/02/2023 1:52 PM
|
Upon failure of VD-580 |
Frequency
|
Published
|
10/02/2023 1:50 PM
|
Warning |
Annotation Type
|
Published
|
03/02/2020 3:25 PM
|
Caution |
Annotation Type
|
Published
|
03/02/2020 3:24 PM
|
Note |
Annotation Type
|
Published
|
03/02/2020 3:25 PM
|
Technician 1 |
Skill Level
|
Published
|
05/14/2020 2:56 PM
|
Keys to access RPM |
Replacement Parts
|
Published
|
04/27/2023 6:56 PM
|
Reflective safety vest if required |
Replacement Parts
|
Published
|
06/20/2023 4:47 PM
|
Ladder: 2 meters, 6 feet tall; non-conducting |
Replacement Parts
|
Published
|
09/01/2023 9:34 PM
|
Traffic control cones or equivalent if required |
Replacement Parts
|
Published
|
06/20/2023 4:47 PM
|
safety glasses |
Replacement Parts
|
Published
|
07/02/2023 4:48 PM
|
Needle nose pliers |
Tools
|
Published
|
05/06/2020 4:10 PM
|
Disconnect Ethernet cable on top of SC-770 box |
Image
|
Published
|
10/04/2023 2:59 PM
|
LD-260 Disconnect Switch Power Off |
Image
|
Published
|
04/24/2023 12:49 PM
|
Pull VD-580 off gently to remove from PMT |
Image
|
Published
|
10/16/2023 10:15 AM
|
Potted version has visible gel coating on circuit board. |
Image
|
Published
|
10/02/2023 3:39 PM
|
Line up alignment key and notch between PMT and VD 580 |
Image
|
Published
|
10/02/2023 3:40 PM
|
LD-260 Disconnect Switch Power On |
Image
|
Published
|
05/04/2023 3:37 PM
|