T8 Torx screwdriver

PackEye Reseat Indicator Connections

Last Updated: 04/26/2025 1:42 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
6744 - 6743 - Disassemble Indicator Unit; Remark:
Procedure Step
Published
12/09/2022 3:38 PM
6743 - Disassemble Indicator Unit
Instruction
Published
12/09/2022 3:38 PM
3869 - 313 - Power off instrument; Remark:3850
Procedure Step
Published
03/29/2022 2:23 AM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
3850 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
03/29/2022 1:38 AM
6753 - 6752 - Remove two (2) screw caps; Remark:6751
Procedure Step
Published
12/09/2022 3:47 PM
6752 - Remove two (2) screw caps
Instruction
Published
12/09/2022 3:46 PM
6751 - These are located on the front panel. Use 2.5-mm slotted screwdriver. Retain ...
Remark
Published
12/09/2022 3:47 PM
6754 - 6750 - Remove two (2) front panel screws; Remark:6749
Procedure Step
Published
12/09/2022 3:49 PM
6750 - Remove two (2) front panel screws
Instruction
Published
12/09/2022 3:48 PM
6749 - Use a T8 Torx driver. Retain screws.
Remark
Published
12/09/2022 3:49 PM
6755 - 6748 - Remove front panel; Remark:6747
Procedure Step
Published
12/09/2022 3:50 PM
6748 - Remove front panel
Instruction
Published
12/09/2022 3:49 PM
6747 -
Remark
Published
12/09/2022 3:50 PM
6756 - 6746 - Disconnect ribbon cable from front panel; Remark:6745
Procedure Step
Published
12/09/2022 3:53 PM
6746 - Disconnect ribbon cable from front panel
Instruction
Published
12/09/2022 3:51 PM
6745 -
Remark
Published
12/09/2022 3:53 PM
6742 - 6741 - Check internal connections; Remark:
Procedure Step
Published
12/09/2022 3:39 PM
6741 - Check internal connections
Instruction
Published
12/09/2022 3:39 PM
6807 - 6806 - Reseat ribbon cable on internal board; Remark:6805
Procedure Step
Published
12/12/2022 1:13 PM
6815 - Caution : Take care not to touch or damage circuit boards.
Annotation
Published
12/12/2022 4:58 PM
6806 - Reseat ribbon cable on internal board
Instruction
Published
12/12/2022 1:10 PM
6805 - Disconnect and reconnect ribbon cable several times to remove oxidation. Veri...
Remark
Published
12/12/2022 1:13 PM
6808 - 6804 - Tighten hardware; Remark:6803
Procedure Step
Published
12/12/2022 1:15 PM
6804 - Tighten hardware
Instruction
Published
12/12/2022 1:14 PM
6803 - Verify nuts on rear of front panel are secure. Check for any other loose hard...
Remark
Published
12/12/2022 1:15 PM
6816 - 6814 - Reseat ribbon cable on front panel; Remark:6813
Procedure Step
Published
12/12/2022 4:52 PM
6814 - Reseat ribbon cable on front panel
Instruction
Published
12/12/2022 4:51 PM
6813 - Disconnect and reconnect ribbon cable several times to remove oxidation. Veri...
Remark
Published
12/12/2022 4:52 PM
6817 - 6812 - Check wiring connections; Remark:6811
Procedure Step
Published
12/12/2022 4:55 PM
6812 - Check wiring connections
Instruction
Published
12/12/2022 4:54 PM
6811 - Check for bad connections, loose wires, or any visible damage Use 2.5-mm slot...
Remark
Published
12/12/2022 4:55 PM
6818 - 319 - Perform operational test; Remark:6809
Procedure Step
Published
12/12/2022 4:57 PM
6810 - Caution : Take care not to touch circuit board while performing an operational test. Do...
Annotation
Published
12/12/2022 4:57 PM
319 - Perform operational test
Instruction
Published
06/10/2021 8:31 PM
6809 - DET-HHD-THR-PAK-RM01, PackEye Operational Test. If PackEye is not fu...
Remark
Published
12/12/2022 4:56 PM
6740 - 6739 - Reassemble Indicator Unit; Remark:
Procedure Step
Published
12/09/2022 3:40 PM
6739 - Reassemble Indicator Unit
Instruction
Published
12/09/2022 3:39 PM
6768 - 6767 - Gently slide internal board into bottom notch of indicator unit housing; Remark:6766
Procedure Step
Published
12/09/2022 4:05 PM
6767 - Gently slide internal board into bottom notch of indicator unit housing
Instruction
Published
12/09/2022 4:01 PM
6766 - IO PackEye Indicator Slot for PCB Installed
Remark
Published
12/09/2022 4:05 PM
6769 - 6765 - Secure back panel with two (2) screws; Remark:6764
Procedure Step
Published
12/09/2022 4:07 PM
6765 - Secure back panel with two (2) screws
Instruction
Published
12/09/2022 4:06 PM
6764 - Rubber gasket must be aligned between back panel and enclosure before inserti...
Remark
Published
12/09/2022 4:07 PM
6770 - 6738 - Replace two (2) screw caps; Remark:6763
Procedure Step
Published
12/09/2022 4:09 PM
6738 - Replace two (2) screw caps
Instruction
Published
12/09/2022 3:20 PM
6763 - IO PackEye Indicator Screw Caps On Back
Remark
Published
12/09/2022 4:09 PM
6771 - 6762 - Reconnect ribbon cable to front panel; Remark:6761
Procedure Step
Published
12/09/2022 4:12 PM
6762 - Reconnect ribbon cable to front panel
Instruction
Published
12/09/2022 4:10 PM
6761 - IO PackEye Indicator Install Ribbon Front Case
Remark
Published
12/09/2022 4:12 PM
6772 - 6760 - Secure front panel with two (2) screws; Remark:6759
Procedure Step
Published
12/09/2022 4:14 PM
6760 - Secure front panel with two (2) screws
Instruction
Published
12/09/2022 4:13 PM
6759 -
Remark
Published
12/09/2022 4:14 PM
6773 - 6738 - Replace two (2) screw caps; Remark:6758
Procedure Step
Published
12/09/2022 4:15 PM
6758 - IO PackEye Indicator Screw Caps Front
Remark
Published
12/09/2022 4:15 PM
6774 - 319 - Perform operational test; Remark:6757
Procedure Step
Published
12/09/2022 4:16 PM
6757 - It is recommended to perform an operational test to verify the instrument was...
Remark
Published
12/09/2022 4:16 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
minutes
Duration
Published
05/26/2022 11:41 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Technician 2
Skill Level
Published
04/09/2020 1:17 AM
2.5-mm slotted screwdriver
Tools
Published
12/09/2022 3:28 PM
T8 Torx screwdriver
Tools
Published
12/09/2022 3:27 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_indica_removescrewcap_front.jpg
Image
Published
10/23/2023 2:26 PM
packeye_di_indica_removescrews_front.jpg
Image
Published
10/23/2023 2:27 PM
packeye_di_indica_removepanel_front.jpg
Image
Published
10/23/2023 2:48 PM
packeye_di_indica_removeribbon_front.jpg
Image
Published
10/23/2023 2:50 PM
packeye_di_indica_reseatribbon_pcb.jpg
Image
Published
10/23/2023 2:54 PM
packeye_di_indica_tightennuts_2yellow.jpg
Image
Published
10/23/2023 2:55 PM
packeye_di_indica_reseatribbon_nocase_front.jpg
Image
Published
10/23/2023 2:56 PM
packeye_di_indica_checkwiring_pcb.jpg
Image
Published
10/24/2023 10:14 AM
packeye_di_indica_installpcbslot.jpg
Image
Published
10/24/2023 10:17 AM
packeye_di_indica_installscrews_back.jpg
Image
Published
10/23/2023 2:37 PM
packeye_di_indica_installscrewcap_back.jpg
Image
Published
10/23/2023 2:42 PM
packeye_di_indica_installribbon_front.jpg
Image
Published
10/23/2023 2:46 PM
packeye_di_indica_installscrews_front.jpg
Image
Published
10/23/2023 2:45 PM
packeye_di_indica_installscrewcaps_front.jpg
Image
Published
10/23/2023 2:40 PM