Last Updated: 04/24/2025 1:43 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
6445 - 6444 - Connect to PackEye; Remark:
Procedure Step
Published
11/30/2022 1:47 PM
6444 - Connect to PackEye
Instruction
Published
11/30/2022 1:47 PM
6451 - 6353 - Connect PackEye to Computer; Remark:6450
Procedure Step
Published
11/30/2022 2:06 PM
6353 - Connect PackEye to Computer
Instruction
Published
11/30/2022 10:56 AM
6450 - Refer to DET-HHD-THR-PAK-RM03, PackEye Computer Connection.
Remark
Published
11/30/2022 2:01 PM
6452 - 6449 - Click Settings...; Remark:6448
Procedure Step
Published
11/30/2022 2:34 PM
6449 - Click Settings...
Instruction
Published
11/30/2022 2:07 PM
6448 - IO PackEye Settings Button
Remark
Published
11/09/2024 9:07 PM
6453 - 6447 - Enter Administrator mode; Remark:6446
Procedure Step
Published
11/30/2022 2:50 PM
6447 - Enter Administrator mode
Instruction
Published
11/30/2022 2:48 PM
6446 - Select Options, then Configurations, then
Remark
Published
11/30/2022 2:50 PM
6822 - 6821 - Adjust High Voltage; Remark:
Procedure Step
Published
12/19/2022 2:03 PM
6821 - Adjust High Voltage
Instruction
Published
12/19/2022 2:03 PM
6832 - 6831 - Select HV Adjustment tab; Remark:6830
Procedure Step
Published
12/19/2022 3:35 PM
6831 - Select HV Adjustment tab
Instruction
Published
12/19/2022 3:32 PM
6830 - IO PackEye Interface HV Adjustment
Remark
Published
11/09/2024 9:08 PM
6833 - 6829 - Document current gamma high voltage; Remark:6828
Procedure Step
Published
12/19/2022 3:36 PM
6829 - Document current gamma high voltage
Instruction
Published
12/19/2022 3:36 PM
6828 - IO PackEye Interface Current HV
Remark
Published
11/09/2024 9:08 PM
6834 - 6827 - Select Cs-137; Remark:6826
Procedure Step
Published
12/19/2022 3:38 PM
6827 - Select Cs-137
Instruction
Published
12/19/2022 3:37 PM
6826 - IO PackEye Interface Select Cesium CS-137
Remark
Published
11/16/2024 8:03 PM
6835 - 3828 - Place gamma source on instrument; Remark:6825
Procedure Step
Published
12/19/2022 3:39 PM
3828 - Place gamma source on instrument
Instruction
Published
03/28/2022 6:18 PM
6825 - Gamma source should be located in center of PackEye for best results.
Remark
Published
12/19/2022 3:39 PM
6836 - 6824 - Click Start HV Setup; Remark:6823
Procedure Step
Published
12/19/2022 3:41 PM
6824 - Click Start HV Setup
Instruction
Published
12/19/2022 3:40 PM
6823 - IO PackEye Interface Start HV Setup
Remark
Published
11/16/2024 8:04 PM
6844 - 6843 - Wait for adjustment to complete; Remark:6842
Procedure Step
Published
12/19/2022 4:37 PM
6843 - Wait for adjustment to complete
Instruction
Published
12/19/2022 4:37 PM
6842 - The screen will update and the Status window will be shaded blue.
Remark
Published
12/19/2022 4:37 PM
6845 - 6841 - Click Update HV; Remark:6840
Procedure Step
Published
12/19/2022 4:39 PM
6841 - Click Update HV
Instruction
Published
12/19/2022 4:38 PM
6840 - The Status window will be shaded green when the process is done.
Remark
Published
12/19/2022 4:39 PM
6846 - 6492 - Click Send; Remark:6839
Procedure Step
Published
12/19/2022 4:41 PM
6492 - Click Send
Instruction
Published
12/01/2022 7:46 PM
6839 - This will update the high voltage.
Remark
Published
12/19/2022 4:40 PM
6847 - 6838 - Click OK to close Settings window; Remark:6837
Procedure Step
Published
12/19/2022 5:10 PM
6838 - Click OK to close Settings window
Instruction
Published
12/19/2022 4:42 PM
6837 - IO PackEye Interface OK Close HV
Remark
Published
11/16/2024 8:10 PM
6475 - 6465 - Close FHT 1377 software; Remark:6632
Procedure Step
Published
12/01/2022 12:49 PM
6465 - Close FHT 1377 software
Instruction
Published
12/01/2022 12:46 PM
6632 - Click File, then Exit. Click Yes
Remark
Published
12/08/2022 9:55 AM
6464 - IO PackEye Exit Menu Interface
Remark
Published
11/16/2024 8:10 PM
6441 - 6440 - Restore Instrument Operation; Remark:
Procedure Step
Published
11/30/2022 1:48 PM
6440 - Restore Instrument Operation
Instruction
Published
11/30/2022 1:48 PM
3869 - 313 - Power off instrument; Remark:3850
Procedure Step
Published
03/29/2022 2:23 AM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
3850 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
03/29/2022 1:38 AM
6457 - 6456 - Disconnect USB/Serial adapter; Remark:6455
Procedure Step
Published
11/30/2022 3:05 PM
6456 - Disconnect USB/Serial adapter
Instruction
Published
11/30/2022 3:03 PM
6455 - IO PackEye Serial Cable Disconnect
Remark
Published
11/16/2024 8:11 PM
5792 - 5786 - Reconnect RS232 jumper; Remark:5785
Procedure Step
Published
11/03/2022 3:42 PM
5786 - Reconnect RS232 jumper
Instruction
Published
11/03/2022 3:39 PM
5785 - Use small, slotted screwdriver to secure connector.
Remark
Published
11/16/2022 9:35 AM
5830 - IO PackEye RS232 Connect Cable
Remark
Published
11/09/2024 8:14 PM
6458 - 319 - Perform operational test; Remark:6454
Procedure Step
Published
11/30/2022 3:06 PM
319 - Perform operational test
Instruction
Published
06/10/2021 8:31 PM
6454 - DET-HHD-THR-PAK-RM01, PackEye Operational Test.
Remark
Published
11/30/2022 3:06 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Routine Maintenance Procedure
Document Type
Published
03/02/2020 3:31 PM
minutes
Duration
Published
05/26/2022 11:41 AM
Annually
Frequency
Published
04/01/2020 11:37 AM
Directed to do so by maintenance support
Frequency
Published
12/19/2022 5:55 PM
FHT 681 replacement
Frequency
Published
12/19/2022 5:54 PM
Gamma detector replacement
Frequency
Published
12/19/2022 5:53 PM
Instrument is not functioning correctly (nuisance alarms)
Frequency
Published
12/19/2022 5:53 PM
Technician 2
Skill Level
Published
04/09/2020 1:17 AM
Computer
Tools
Published
05/09/2020 3:05 PM
FHT 1377 software
Tools
Published
11/30/2022 1:25 PM
USB-A male to RS-232 (DB9) male serial adapter (USB/Serial adapter)
Tools
Published
11/30/2022 1:26 PM
packeye_ui_fhtapp_settings.jpg
Image
Published
10/23/2023 10:14 AM
packeye_ui_fhtapp_administrator.jpg
Image
Published
10/23/2023 1:24 PM
packeye_ui_fhtapp_hv_selecttab.jpg
Image
Published
10/23/2023 1:26 PM
packeye_ui_fhtapp_hv_currentvalue.jpg
Image
Published
10/23/2023 1:27 PM
packeye_ui_fhtapp_hv_cs137.jpg
Image
Published
10/23/2023 1:29 PM
packeye_diradsource_placecenter.jpg
Image
Published
10/23/2023 9:46 AM
packeye_ui_config_hv_startsetup.jpg
Image
Published
10/23/2023 1:30 PM
packeye_ui_fhtapp_hv_bluescreen.jpg
Image
Published
10/23/2023 1:31 PM
packeye_ui_fhtapp_hv_greenoptimized.jpg
Image
Published
10/23/2023 1:33 PM
packeye_ui_fhtapp_sendt1031.jpg
Image
Published
10/23/2023 1:40 PM
packeye_ui_fhtapp_hv_okclose.jpg
Image
Published
10/23/2023 1:34 PM
packeye_ui_fhtapp_exit.jpg
Image
Published
10/23/2023 1:35 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_serialcable_remove.jpg
Image
Published
10/23/2023 9:51 AM
packeye_di_rs232cable_insert.jpg
Image
Published
10/23/2023 9:48 AM
DET-HHD-THR-PAK-RM05

Conduct high voltage adjustment of the PackEye gamma detector using FHT 1377 software. This procedure can also be performed using the Handheld Assessment and Troubleshooting Software (HATS).

Equipment Hierarchy
Thermo FHT1377 PackEye
Frequency
Annually
Directed to do so by maintenance support
FHT 681 replacement
Gamma detector replacement
Instrument is not functioning correctly (nuisance alarms)
Technician Level
Technician Level
Technician 2
x 1
Duration
Time increment
minutes
Length of time
20
Tools Required
Computer
FHT 1377 software
USB-A male to RS-232 (DB9) male serial adapter (USB/Serial adapter)
Materials Required
Radioactive check source of Cs-137 activity 37 kBq or greater
Originators
Kriss, Aaron
Tucker, Brian
Originating Organization
PNNL
Approver
Cody Hostick
Safety Concerns
Radioactive Source
Retest Requirements
Final Documentation
Routine Maintenance Report
Departmental Coordination

Prior to arrival, notify operators concerning expected work, duration, and anticipated alarms and fault indications.

Date of Origin
Step 2
Document Type
Routine Maintenance Procedure
Percent Complete
100.00
Percent Complete W/Media
100.00