Step 00

7734 - Perform procedure DET-RPM-RAP‐RM03 RPM Operational Testing.

Perform procedure DET-RPM-RAP‐RM03 RPM Operational Testing.


Verify all faults and alarms indicate properly at the RPM if personnel and communication with the CAS are available. 
Verify the faults and alarms are displayed on the CAS workstation at this time as well.


Place a check in each box on the FCT to indicate that each fault and alarm was successful (image below).
 

படம்
Test Results