Last Updated: 04/24/2025 1:39 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Smiths Detection RadSeeker CS
Device
Published
06/27/2024 12:54 PM
247 - 257 - Prepare instrument; Remark:
Procedure Step
Published
04/11/2025 9:08 PM
257 - Prepare instrument
Instruction
Published
04/11/2025 9:07 PM
786 - 219 - Verify there are no sources of radiation near instrument; Remark:7
Procedure Step
Published
04/20/2025 6:37 PM
219 - Verify there are no sources of radiation near instrument
Instruction
Published
04/12/2025 4:20 PM
7 - No Radiation symbol
Remark
Published
07/12/2021 1:34 PM
3512 - 2295 - Verify sufficient battery charge; Remark:2297
Procedure Step
Published
07/28/2021 9:32 PM
2295 - Verify sufficient battery charge
Instruction
Published
04/06/2021 4:43 PM
2297 - IO RadSeeker 3 bar Battery
Remark
Published
10/19/2024 10:28 PM
2460 - 220 - Power on instrument; Remark:2303
Procedure Step
Published
11/04/2020 5:34 PM
2360 - Caution : Temperature must be above -15°C for instrument to start. Do not operate the ...
Annotation
Published
11/04/2020 5:27 PM
220 - Power on instrument
Instruction
Published
04/06/2025 7:00 PM
2303 - Press and hold ENTER button until display powers on (3 to 5 ...
Remark
Published
07/23/2021 8:41 PM
2298 - IO RadSeeker Button Pad Select Button Yellow Box
Remark
Published
10/21/2024 7:26 PM
2462 - 612 - Wait for instrument to complete start-up sequence; Remark:2306
Procedure Step
Published
04/13/2025 6:49 PM
612 - Wait for instrument to complete start-up sequence
Instruction
Published
04/13/2025 6:38 PM
2306 - The instrument will automatically enter Detect mode after sy...
Remark
Published
07/23/2021 8:45 PM
252 - 232 - Check instrument gamma response; Remark:
Procedure Step
Published
07/29/2021 11:10 AM
232 - Check instrument gamma response
Instruction
Published
07/23/2021 9:58 AM
3513 - 2352 - Verify Audible Dose Rate Indicator (ADI) is on; Remark:3502
Procedure Step
Published
07/28/2021 9:34 PM
2352 - Verify Audible Dose Rate Indicator (ADI) is on
Instruction
Published
07/29/2021 12:52 PM
3502 - Use ADI button to activate an auditory equivalent to the visual historical gr...
Remark
Published
07/28/2021 9:18 PM
2324 - IO RadSeeker ADI Bar
Remark
Published
10/21/2024 7:33 PM
3514 - 235 - Place instrument next to radioactive gamma source; Remark:3507
Procedure Step
Published
06/06/2022 5:25 PM
235 - Place instrument next to radioactive gamma source
Instruction
Published
07/09/2021 1:39 PM
3507 - IO RadSeeker Closer to Trefoil
Remark
Published
10/21/2024 8:54 PM
3515 - 3509 - Verify DETECT mode responds correctly; Remark:3510
Procedure Step
Published
07/28/2021 9:36 PM
3509 - Verify DETECT mode responds correctly
Instruction
Published
07/28/2021 9:37 PM
3510 - The instrument should respond as follows:
Remark
Published
07/28/2021 9:28 PM
2310 - Gamma Dose Rate (µSv/hr) values will increase. Gamma coun...
Remark
Published
11/04/2020 7:38 AM
3516 - 241 - Move instrument away from radioactive gamma source; Remark:3508
Procedure Step
Published
06/06/2022 5:27 PM
241 - Move instrument away from radioactive gamma source
Instruction
Published
06/25/2021 12:22 PM
3508 - IO RadSeeker Away from Trefoil
Remark
Published
10/21/2024 8:54 PM
3517 - 3511 - Check Instrument Neutron Response; Remark:
Procedure Step
Published
07/28/2021 9:39 PM
3511 - Check Instrument Neutron Response
Instruction
Published
07/28/2021 9:29 PM
3519 - 3095 - Place instrument next to radioactive neutron source; Remark:3507
Procedure Step
Published
06/06/2022 6:30 PM
3095 - Place instrument next to radioactive neutron source
Instruction
Published
07/16/2021 10:49 AM
3518 - 3501 - Verify DETECT mode responds correctly; Remark:3500
Procedure Step
Published
07/28/2021 9:40 PM
3096 - Note : Most radioactive neutron sources also have a gamma component, which will likely ...
Annotation
Published
07/23/2021 9:57 AM
3501 - Verify DETECT mode responds correctly
Instruction
Published
07/28/2021 9:12 PM
3500 - The instrument should respond as follows: Vibrate and alarm...
Remark
Published
07/28/2021 9:42 PM
3499 - N-cps values will increase and have a red color. Moving gr...
Remark
Published
07/28/2021 9:10 PM
3520 - 3098 - Move instrument away from radioactive neutron source; Remark:3508
Procedure Step
Published
06/06/2022 6:33 PM
3098 - Move instrument away from radioactive neutron source
Instruction
Published
07/16/2021 10:54 AM
2251 - 2217 - Perform Identification Measurement; Remark:
Procedure Step
Published
07/28/2021 9:55 PM
2217 - Perform Identification Measurement
Instruction
Published
04/06/2021 5:13 PM
3521 - 859 - Start identification measurement; Remark:3498
Procedure Step
Published
07/28/2021 9:46 PM
859 - Start identification measurement
Instruction
Published
10/26/2020 7:00 PM
3498 - Press ENTER under Start ID
Remark
Published
07/28/2021 9:07 PM
3486 - IO RadSeeker StartID Small Menu
Remark
Published
10/21/2024 8:54 PM
2491 - 2220 - Wait for measurement to complete; Remark:2321
Procedure Step
Published
04/20/2025 12:55 PM
2220 - Wait for measurement to complete
Instruction
Published
10/22/2020 11:15 AM
2321 - IO RadSeeker Collecting Spectrum Wait
Remark
Published
10/21/2024 8:36 PM
2492 - 2357 - Acknowledge alarms; Remark:2326
Procedure Step
Published
11/04/2020 5:49 PM
2357 - Acknowledge alarms
Instruction
Published
07/23/2021 9:29 PM
2326 - Press ENTER to acknowledge innocent or threat alarms.
Remark
Published
07/23/2021 9:35 PM
2320 - IO RadSeeker Alarm Acknowledge Threat
Remark
Published
10/21/2024 8:40 PM
3522 - 1442 - Verify identification results are correct; Remark:3497
Procedure Step
Published
07/28/2021 9:47 PM
1442 - Verify identification results are correct
Instruction
Published
09/02/2020 3:03 PM
3497 - Identification results should match the isotopes associated with the radioact...
Remark
Published
07/28/2021 9:04 PM
2319 - IO RadSeeker Identify Isotope Co60
Remark
Published
10/21/2024 8:42 PM
253 - 242 - Document and report any unresolved problems; Remark:
Procedure Step
Published
06/22/2021 10:23 AM
242 - Document and report any unresolved problems
Instruction
Published
04/21/2025 11:45 AM
Operator Procedure
Document Type
Published
03/02/2020 3:31 PM
5 minutes
Duration
Published
04/01/2020 11:35 AM
Annually
Frequency
Published
04/01/2020 11:37 AM
Before each use
Frequency
Published
08/31/2020 5:00 PM
Monthly
Frequency
Published
04/01/2020 11:36 AM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
None
Tools
Published
05/06/2020 9:50 PM
No Radiation Symbol
Image
Published
08/13/2024 2:56 PM
radseeker_di_battbar_000477.jpg
Image
Published
10/18/2023 4:32 PM
radseeker_di_selectmiddle_00473.jpg
Image
Published
10/20/2023 9:35 AM
radseeker_ui_modedetect_217cps_00467.jpg
Image
Published
10/20/2023 10:15 AM
radseeker_ui_adiselect_00471.jpg
Image
Published
10/20/2023 9:42 AM
radseeker_di_MoveToward_rad_00668.jpg
Image
Published
10/20/2023 9:33 AM
radseeker_ui_increasgr_11164cps_00463.jpg
Image
Published
10/20/2023 10:07 AM
radseeker_di_MoveAway_rad_00669.jpg
Image
Published
10/20/2023 9:32 AM
radseeker_ui_neutronalarmack_nobutton_252cps_00654.jpg
Image
Published
10/20/2023 10:18 AM
radseeker_ui_alarm_neutron_1783cps_00656.jpg
Image
Published
10/20/2023 9:43 AM
radseeker_ui_menustartid_button_00651.jpg
Image
Published
10/20/2023 10:11 AM
radseeker_ui_collectspec_00468.jpg
Image
Published
10/20/2023 9:46 AM
radseeker_ui_threatack_1025cps_00457.jpg
Image
Published
10/20/2023 10:22 AM
radseeker_ui_idco60_902cps_00465.jpg
Image
Published
10/20/2023 10:06 AM
DET-HHD-SMD-RSK-RM01

Check the instrument operation and response to a source of radiation. The source of radiation may be any material that causes an alarm, including consumer products or naturally occurring radioactive materials.

Equipment Hierarchy
Smiths Detection RadSeeker CS
Frequency
Annually
Before each use
Monthly
Technician Level
Technician Level
Technician 1
x 1
Duration
Time increment
5 minutes
Length of time
5
Tools Required
None
Materials Required
Cs-137 activity 37 kBq (1-10 μCi) or gamma radioactive source with activity high enough to create alarm
Cf-252 activity 37 kBq (1-10 μCi)
Originators
Goodwin, Shannon
Tucker, Brian
Originating Organization
PNNL
Approver
Simons, Brian
Safety Concerns
Radioactive Source
Final Documentation
None
Departmental Coordination

Prior to arrival, notify operators concerning expected work and duration.

Date of Origin
Version
0.00
Step 3

3518 - 3501 - Verify DETECT mode responds correctly; Remark:3500

Step 00
Document Type
Operator Procedure
Percent Complete
100.00
Percent Complete W/Media
100.00