Last Updated: 04/25/2025 1:43 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Rapiscan VM-250 Vehicle Monitor
Device
Published
10/14/2024 9:50 AM
Rapiscan PM-700 Pedestrian Monitor
Device
Published
06/20/2024 11:38 AM
Rapiscan TM-850 Rail Monitor
Device
Published
09/18/2024 10:28 AM
9584 - 9543 - Neutron Tube Serial Number; Remark:
Procedure Step
Published
10/11/2023 8:02 AM
9543 - Neutron Tube Serial Number
Instruction
Published
10/10/2023 3:49 PM
9585 - 9544 - Record serial number; Remark:9546
Procedure Step
Published
10/11/2023 8:02 AM
9544 - Record serial number
Instruction
Published
10/10/2023 3:49 PM
9546 - Only performed on detector tubes removed from the RPM.
Remark
Published
10/10/2023 4:18 PM
10325 - 10324 - Remove MHV Outer Connector Shell; Remark:
Procedure Step
Published
11/18/2023 2:45 PM
10324 - Remove MHV Outer Connector Shell
Instruction
Published
11/18/2023 2:45 PM
9586 - 9547 - Remove MHV outer connector shell; Remark:9548
Procedure Step
Published
10/11/2023 8:04 AM
9545 - Caution : Oils from skin may contaminate the insulating surfaces. Either lint-free cott...
Annotation
Published
10/10/2023 3:51 PM
9604 - Caution : Avoid tearing or binding the rubber O-ring at the base of the connector shell...
Annotation
Published
10/11/2023 11:09 AM
9547 - Remove MHV outer connector shell
Instruction
Published
10/10/2023 4:19 PM
9548 - Use adjustable wrench. Loosen and unscrew connector shell.
Remark
Published
04/13/2025 6:08 PM
9587 - 9549 - Confirm O-ring is positioned above threaded surface and undamaged; Remark:9550
Procedure Step
Published
10/11/2023 8:05 AM
9549 - Confirm O-ring is positioned above threaded surface and undamaged
Instruction
Published
10/10/2023 8:27 PM
9550 - The O-ring size is 0.79 mm (0.031 in.) cross section by 19.69 mm (0.775 in.) ...
Remark
Published
10/10/2023 8:30 PM
10329 - 10328 - Remove Teflon Insulator Ring; Remark:
Procedure Step
Published
11/18/2023 2:55 PM
10328 - Remove Teflon Insulator Ring
Instruction
Published
11/18/2023 2:55 PM
9588 - 9551 - Remove Teflon insulator ring from ceramic core insulator; Remark:9552
Procedure Step
Published
10/11/2023 8:05 AM
9573 - Caution : Do not bend or twist the high voltage wire lead.
Annotation
Published
10/10/2023 10:12 PM
9551 - Remove Teflon insulator ring from ceramic core insulator
Instruction
Published
10/10/2023 8:38 PM
9552 - Carefully pull Teflon insulator ring along the tube axis
Remark
Published
04/13/2025 6:07 PM
10327 - 10326 - Inspect Neutron Tube Insulator; Remark:
Procedure Step
Published
11/18/2023 2:56 PM
10326 - Inspect Neutron Tube Insulator
Instruction
Published
11/18/2023 2:56 PM
9589 - 9553 - Examine surface condition of neutron tube insulator; Remark:9554
Procedure Step
Published
04/13/2025 6:15 PM
9553 - Examine surface condition of neutron tube insulator
Instruction
Published
04/13/2025 6:07 PM
9554 - Questionable insulator
Remark
Published
10/10/2023 9:37 PM
9555 - Typical insulator
Remark
Published
04/13/2025 6:07 PM
9590 - 9556 - Clean Insulator Core and Ring; Remark:
Procedure Step
Published
10/11/2023 8:12 AM
9556 - Clean Insulator Core and Ring
Instruction
Published
10/10/2023 9:40 PM
9591 - 9557 - Rinse ceramic and Teflon insulators; Remark:9558
Procedure Step
Published
04/13/2025 6:15 PM
9559 - Warning : Use nitrile gloves as sensitive skin may react to the alcohol
Annotation
Published
10/10/2023 9:52 PM
9560 - Caution : For quality check, spray alcohol on a piece of clean glass and let evaporate....
Annotation
Published
10/10/2023 9:54 PM
9557 - Rinse ceramic and Teflon insulators
Instruction
Published
04/13/2025 6:07 PM
9558 - Using a stream spray of alcohol, coat insulators and allow to evaporate.&nbsp...
Remark
Published
10/10/2023 9:49 PM
9592 - 9561 - Wipe insulator; Remark:9562
Procedure Step
Published
10/11/2023 8:14 AM
9561 - Wipe insulator
Instruction
Published
10/10/2023 9:54 PM
9562 - Sweep surfaces with cottom swab, or lint-free cloth soaked in alcohol.
Remark
Published
11/18/2023 3:17 PM
10332 - Continue to sweep and rinse until dust particles no longer appear on the swab...
Remark
Published
11/18/2023 3:18 PM
9593 - 9563 - Inspect for and remove cotton fibers; Remark:9564
Procedure Step
Published
10/11/2023 8:15 AM
9563 - Inspect for and remove cotton fibers
Instruction
Published
10/10/2023 10:01 PM
9564 - Remove cotton fibers deposited in insulator areas using tweezers.
Remark
Published
04/13/2025 6:06 PM
9594 - 9566 - Dry insulators; Remark:9567
Procedure Step
Published
10/11/2023 8:16 AM
9565 - Caution : Heating of the detector tube shall not exceed 100°C.
Annotation
Published
10/10/2023 10:05 PM
9566 - Dry insulators
Instruction
Published
10/10/2023 10:05 PM
9567 - Allow components to air dry.
Remark
Published
10/10/2023 10:06 PM
9595 - 9568 - Clean connector shell; Remark:9569
Procedure Step
Published
10/11/2023 8:16 AM
9568 - Clean connector shell
Instruction
Published
10/10/2023 10:06 PM
9569 - The interior of the narrow-size barrel is the primary contact surface to clea...
Remark
Published
10/10/2023 10:09 PM
7279 - 7249 - Return equipment to normal operating condition; Remark:
Procedure Step
Published
04/27/2023 4:13 PM
7249 - Return equipment to normal operating condition
Instruction
Published
04/08/2025 3:22 PM
9597 - 9571 - Confirm O-ring is in place; Remark:9572
Procedure Step
Published
10/11/2023 8:18 AM
9571 - Confirm O-ring is in place
Instruction
Published
10/10/2023 10:10 PM
9572 - No lubrication is necessary.
Remark
Published
10/10/2023 10:12 PM
9598 - 9574 - Reinstall ring insulator; Remark:9575
Procedure Step
Published
04/13/2025 6:15 PM
9574 - Reinstall ring insulator
Instruction
Published
04/13/2025 6:06 PM
9575 - Slide ring insulator over core insulator and high voltage wire lead.
Remark
Published
04/13/2025 6:06 PM
9599 - 9577 - Screw connector shell in place; Remark:9578
Procedure Step
Published
10/11/2023 8:19 AM
9576 - Note : Carefully place threads to avoid cross-threading of shell with the tube wall....
Annotation
Published
10/10/2023 10:17 PM
9577 - Screw connector shell in place
Instruction
Published
10/10/2023 10:17 PM
9578 - Screw connector shell until finger tight.
Remark
Published
04/13/2025 6:05 PM
10331 - 10330 - Test detector tube in an RPM or text fixture when possible; Remark:
Procedure Step
Published
11/18/2023 3:12 PM
10330 - Test detector tube in an RPM or text fixture when possible
Instruction
Published
11/18/2023 3:12 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
hours
Duration
Published
05/26/2022 11:45 AM
Upon neutron detector tube failure
Frequency
Published
10/11/2023 10:33 AM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Warning
Annotation Type
Published
03/02/2020 3:25 PM
Note
Annotation Type
Published
03/02/2020 3:25 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
Adjustable wrench
Replacement Parts
Published
06/02/2023 10:08 PM
Tweezers
Tools
Published
08/30/2022 4:28 PM
Safety glasses if required
Replacement Parts
Published
06/20/2023 4:47 PM
Neutron Tube SN Location
Image
Published
10/10/2023 4:13 PM
Neutron Tube Serial Number Location
Image
Published
10/10/2023 4:14 PM
Neutron O-ring
Image
Published
10/10/2023 8:30 PM
Neutron Tube Axis
Image
Published
10/10/2023 8:37 PM
Neutron Questionable Insulator
Image
Published
10/10/2023 9:32 PM
Neutron Typical Insulator
Image
Published
10/10/2023 9:34 PM
Wipe Neutron Insulator
Image
Published
10/10/2023 9:56 PM
Neutron Tube Shell
Image
Published
10/10/2023 10:07 PM
Neutron Insulator
Image
Published
10/10/2023 10:14 PM
DET-RPM-RAP-CM29

Clean alumina ceramic insulator on GE Reuter-Stokes proportional neutron counter detector tube. This is performed only when detector tubes are removed from moderator box. 

Equipment Hierarchy
Rapiscan VM-250 Vehicle Monitor
Rapiscan PM-700 Pedestrian Monitor
Rapiscan TM-850 Rail Monitor
Frequency
Upon neutron detector tube failure
Technician Level
Technician Level
Технік 1 кат.
x 1
Duration
Time increment
hours
Length of time
2
Tools Required
Adjustable wrench
Tweezers
Safety glasses if required
Materials Required
Nitrile rubber gloves or lint-free cotton gloves
Isopropyl alcohol
Cotton swab
O-ring (if required) Parker part number is E0515 (-80) size 5-137
Originators
Ron Pawlowski
Originating Organization
PNNL
Approver
Craig Stinson
Safety Concerns
Chemical
Additional Retest Requirements Information

If available, use an RPM or desktop RPM to test the neutron detector.

Final Documentation
Corrective Maintenance Report
Departmental Coordination

Prior to arrival, notify operators concerning expected work, duration, and anticipated alarms and fault indications. 

Date of Origin
Version
0.00
Підготовка
Step 1
Експлуатація
Step 2

9586 - 9547 - Remove MHV outer connector shell; Remark:9548

Step 00

9587 - 9549 - Confirm O-ring is positioned above threaded surface and undamaged; Remark:9550

Step 00
Експлуатація
Step 3
Експлуатація
Step 4
Експлуатація
Step 5

9591 - 9557 - Rinse ceramic and Teflon insulators; Remark:9558

Step 00
Document Type
Corrective Maintenance Procedure
Percent Complete
100.00
Percent Complete W/Media
100.00