Last Updated: 04/27/2025 1:35 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Atomtex AT6101C Backpack
Device
Published
06/27/2024 1:47 PM
879 - 878 - Power off BT-DU3 Adapter; Remark:877
Procedure Step
Published
05/28/2020 5:04 PM
878 - Power off BT-DU3 Adapter
Instruction
Published
05/28/2020 5:04 PM
877 - To power off the BT-DU3 Adapter, press the PWR button for ab...
Remark
Published
11/12/2020 6:09 PM
1693 - 1672 - Locate gamma detector; Remark:1692
Procedure Step
Published
11/20/2020 12:27 PM
1672 - Locate gamma detector
Instruction
Published
11/18/2020 8:03 PM
1692 - The gamma detector should be located in the backpack compartment closest to t...
Remark
Published
11/18/2020 8:05 PM
1696 - 1673 - Remove gamma detector; Remark:
Procedure Step
Published
11/29/2020 11:28 AM
1673 - Remove gamma detector
Instruction
Published
12/09/2022 1:34 PM
1697 - 1674 - Remove adapter cable from gamma detector; Remark:1691
Procedure Step
Published
11/29/2020 11:28 AM
1694 - Caution : Ensure the BT-DU3 adapter unit is powered off before removing or connecting d...
Annotation
Published
11/23/2020 5:30 PM
1674 - Remove adapter cable from gamma detector
Instruction
Published
11/23/2020 5:01 PM
1691 - To remove the push-pull type connector, hold the connector by the collar only...
Remark
Published
11/23/2020 4:49 PM
1698 - 1675 - Remove gamma detector from backpack; Remark:1690
Procedure Step
Published
11/29/2020 11:29 AM
1675 - Remove gamma detector from backpack
Instruction
Published
11/29/2020 11:11 AM
1690 - IO AT6101C Gamma Detector Remove red arrow
Remark
Published
11/29/2020 11:25 AM
1699 - 1676 - Record serial numbers of faulty and replacement gamma detectors; Remark:1689
Procedure Step
Published
11/29/2020 11:30 AM
1676 - Record serial numbers of faulty and replacement gamma detectors
Instruction
Published
11/29/2020 11:12 AM
1689 - IO AT6101C Gamma Detector Serial Number
Remark
Published
11/29/2020 11:24 AM
1700 - 1677 - Install replacement gamma detector; Remark:
Procedure Step
Published
11/29/2020 11:31 AM
1677 - Install replacement gamma detector
Instruction
Published
11/29/2020 11:20 AM
1701 - 1678 - Slide gamma detector into backpack; Remark:1688
Procedure Step
Published
11/29/2020 11:32 AM
1678 - Slide gamma detector into backpack
Instruction
Published
11/29/2020 11:13 AM
1688 - IO AT6101C Gamma Detector Install red arrow
Remark
Published
11/23/2020 4:50 PM
1702 - 1679 - Align connector of adapter cable with detector connector; Remark:1687
Procedure Step
Published
11/24/2020 9:09 AM
1679 - Align connector of adapter cable with detector connector
Instruction
Published
11/29/2020 11:14 AM
1687 - There may be red dots that can be used to align the connectors.
Remark
Published
11/29/2020 11:51 AM
1686 - Connectors only fit in one orientation. Gently rotate the DU cable connector ...
Remark
Published
11/23/2020 4:51 PM
1703 - 1680 - Connect cable to BDKG-11M gamma detector; Remark:1685
Procedure Step
Published
11/24/2020 9:10 AM
1695 - Caution : Do not force the connectors together.
Annotation
Published
11/19/2020 5:54 PM
1680 - Connect cable to BDKG-11M gamma detector
Instruction
Published
11/23/2020 4:59 PM
1685 - For the push-pull type, grip the back of the connector behind the collar to r...
Remark
Published
11/23/2020 4:52 PM
1704 - 1634 - Verify system is operating correctly; Remark:
Procedure Step
Published
11/24/2020 9:12 AM
1634 - Verify system is operating correctly
Instruction
Published
11/29/2020 11:16 AM
1378 - 1377 - Power on BT-DU3 Adapter; Remark:1376
Procedure Step
Published
11/19/2020 5:48 PM
1377 - Power on BT-DU3 Adapter
Instruction
Published
09/30/2020 4:33 PM
1376 - Power Button on BT-DU3
Remark
Published
09/17/2020 10:06 AM
1705 - 1681 - Verify gamma detector is connected to BT-DU3; Remark:1684
Procedure Step
Published
11/29/2020 11:33 AM
1681 - Verify gamma detector is connected to BT-DU3
Instruction
Published
11/29/2020 11:17 AM
1684 - The D1 LED will be blinking rapidly.
Remark
Published
11/29/2020 11:23 AM
1706 - 319 - Perform operational test; Remark:1385
Procedure Step
Published
11/29/2020 11:34 AM
319 - Perform operational test
Instruction
Published
06/10/2021 8:31 PM
1385 - DET-HHD-ATM-RM01 AT6101C Operational Test.
Remark
Published
11/19/2020 5:40 PM
1707 - 1682 - Tag suspect part with fault information; Remark:1683
Procedure Step
Published
11/29/2020 11:35 AM
1682 - Tag suspect part with fault information
Instruction
Published
11/29/2020 11:19 AM
1683 - Dispose of the faulty BDKG-11M per organizational and local jurisdiction requ...
Remark
Published
11/29/2020 11:52 AM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
15 minutes
Duration
Published
04/01/2020 11:35 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
None
Tools
Published
05/06/2020 9:50 PM
Atomtex_BT-DU3_Power_Button
Image
Published
09/04/2020 10:30 PM
AT6101C_Gamma_red_circle_0.png
Image
Published
09/04/2020 10:51 PM
AT6101C Connector Removal red arrows
Image
Published
09/04/2020 10:51 PM
AT6101C_Gamma_Detector_Remove_red_arrow
Image
Published
09/04/2020 10:49 PM
AT6101C_Gamma_Serial_Number_Location
Image
Published
09/04/2020 10:21 PM
AT6101C_Gamma_Serial_Number_0.png
Image
Published
09/04/2020 10:49 PM
AT6101C_Gamma_Detector_Install_red_arrow
Image
Published
09/04/2020 10:48 PM
AT6101C_Connector_Cable_Align_Dots_red_arrow
Image
Published
09/04/2020 10:48 PM
BT-DU3 Cable Connector Tab
Image
Published
09/04/2020 10:42 PM
Attaching Detector Cables_0.png
Image
Published
09/04/2020 10:42 PM
AT6101C_BTDU3_LED_DU1_red_circle
Image
Published
09/04/2020 10:48 PM
DET-HHD-ATM-CM02

Replace BDKG-11M gamma radiation detection unit

Equipment Hierarchy
Atomtex AT6101C Backpack
Frequency
As Needed
Technician Level
Technician Level
Technician 1
x 1
Duration
Time increment
15 minutes
Tools Required
None
Materials Required
BDKG-11M gamma radiation detection unit
Retest Requirements
Departmental Coordination

Coordinate with relevant authorities

Step 1
Main Step
Step 2
Main Step
Step 3

1697 - 1674 - Remove adapter cable from gamma detector; Remark:1691

Step 00
Step 5

1702 - 1679 - Align connector of adapter cable with detector connector; Remark:1687

Step 00
Step 7
Main Step
Document Type
Corrective Maintenance Procedure
Percent Complete
100.00
Percent Complete W/Media
100.00