7928 - 7927 - Establish Initial Conditions; Remark:
Procedure Step
Published
07/12/2023 12:24 AM
7927 - Establish Initial Conditions
Instruction
Published
07/12/2023 12:23 AM
7969 - 7968 - Close lane; Remark:8224
Procedure Step
Published
07/12/2023 12:35 AM
8226 - Warning : Traffic should temporarily be rerouted or halted during this procedure to ens...
Annotation
Published
09/05/2023 1:04 PM
7968 - Close lane
Instruction
Published
07/12/2023 12:35 AM
8224 - Use orange safety (traffic control) cones to setup barriers. Practice establi...
Remark
Published
09/05/2023 11:26 AM
7926 - 7924 - Open RPM door.; Remark:8223
Procedure Step
Published
07/12/2023 12:25 AM
7924 - Open RPM door.
Instruction
Published
07/12/2023 12:25 AM
8223 - Open all doors needed to access components.
Remark
Published
09/05/2023 11:27 AM
7270 - 7235 - Power off RPM; Remark:7236
Procedure Step
Published
09/01/2023 7:57 PM
7235 - Power off RPM
Instruction
Published
04/24/2023 12:30 PM
7236 - Move LD-260 switch to OFF position. The PWR ON
Remark
Published
04/27/2023 4:25 PM
7964 - 7963 - Inspect Desiccant; Remark:
Procedure Step
Published
07/12/2023 12:44 AM
7963 - Inspect Desiccant
Instruction
Published
10/12/2023 10:01 AM
7959 - 7958 - Inspect existing desiccant bags.; Remark:8233
Procedure Step
Published
07/12/2023 12:47 AM
7958 - Inspect existing desiccant bags.
Instruction
Published
07/12/2023 12:44 AM
8233 - Inspect existing desiccant bags visually and by feel. If the bags are only pa...
Remark
Published
09/05/2023 8:31 PM
7960 - 7956 - Document the current date on the existing bag if no replacement is required.; Remark:
Procedure Step
Published
07/12/2023 12:48 AM
7956 - Document the current date on the existing bag if no replacement is required.
Instruction
Published
07/12/2023 12:48 AM
7961 - 7955 - Inspect interior of RPM cabinets.; Remark:7954
Procedure Step
Published
07/12/2023 12:49 AM
7955 - Inspect interior of RPM cabinets.
Instruction
Published
07/12/2023 12:48 AM
7954 - Inspect cabinets for dirt, debris, and signs of water or rodent/insect infest...
Remark
Published
07/12/2023 12:48 AM
7962 - 7953 - Clean cabinet interior.; Remark:8227
Procedure Step
Published
07/12/2023 12:49 AM
7953 - Clean cabinet interior.
Instruction
Published
07/12/2023 12:49 AM
8227 - Use absorbent cleaning rags if required.
Remark
Published
09/05/2023 1:17 PM
7952 - 7951 - Replace Desiccant; Remark:
Procedure Step
Published
07/12/2023 12:50 AM
7951 - Replace Desiccant
Instruction
Published
10/12/2023 10:02 AM
7947 - 7945 - Remove exhausted desiccant bag(s); Remark:
Procedure Step
Published
07/12/2023 12:51 AM
7945 - Remove exhausted desiccant bag(s)
Instruction
Published
07/12/2023 12:51 AM
7948 - 7944 - Install new desiccant bag(s) in place of removed bag; Remark:
Procedure Step
Published
07/12/2023 12:52 AM
7975 - Caution : Place bags away from electrical connections to avoid damage if desiccant leak...
Annotation
Published
07/21/2023 4:26 PM
7944 - Install new desiccant bag(s) in place of removed bag
Instruction
Published
07/12/2023 12:52 AM
7949 - 7943 - Properly dispose of exhausted desiccant bag; Remark:
Procedure Step
Published
07/12/2023 12:53 AM
7943 - Properly dispose of exhausted desiccant bag
Instruction
Published
07/12/2023 12:52 AM
7279 - 7249 - Return equipment to normal operating condition; Remark:
Procedure Step
Published
04/27/2023 4:13 PM
7249 - Return equipment to normal operating condition
Instruction
Published
04/08/2025 3:22 PM
7280 - 7250 - Power on RPM; Remark:7251
Procedure Step
Published
04/27/2023 4:14 PM
7250 - Power on RPM
Instruction
Published
05/01/2023 8:31 AM
7251 - Move LD-260 switch to ON position. The LED PWR ON
Remark
Published
05/10/2023 3:14 PM
7281 - 7252 - Verify RPM start-up; Remark:7253
Procedure Step
Published
04/20/2025 3:26 PM
7252 - Verify RPM start-up
Instruction
Published
04/27/2023 2:23 PM
7253 - RPM will perform a power on self-test (POST) and collect a background radiati...
Remark
Published
05/10/2023 3:14 PM
7282 - 7254 - Confirm network connection; Remark:7255
Procedure Step
Published
04/27/2023 4:15 PM
7254 - Confirm network connection
Instruction
Published
04/27/2023 2:22 PM
7255 - Contact operators to confirm communications have been reestablished between RPM ...
Remark
Published
05/10/2023 3:15 PM
7283 - 7256 - Close and lock all RPM doors; Remark:
Procedure Step
Published
09/01/2023 11:45 PM
7256 - Close and lock all RPM doors
Instruction
Published
04/27/2023 2:21 PM
7842 - 7820 - Inform system operators upon completion of maintenance action; Remark:
Procedure Step
Published
07/07/2023 11:15 PM
7820 - Inform system operators upon completion of maintenance action
Instruction
Published
07/07/2023 10:02 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Routine Maintenance Procedure
Document Type
Published
03/02/2020 3:31 PM
minutes
Duration
Published
05/26/2022 11:41 AM
Monthly
Frequency
Published
04/01/2020 11:36 AM
Warning
Annotation Type
Published
03/02/2020 3:25 PM
Caution
Annotation Type
Published
03/02/2020 3:24 PM
Technician 1
Skill Level
Published
05/14/2020 2:56 PM
Keys to access RPM
Replacement Parts
Published
04/27/2023 6:56 PM
Reflective safety vest if required
Replacement Parts
Published
06/20/2023 4:47 PM
Ladder; 2 meters, 6 feet tall; non-conducting if required
Replacement Parts
Published
07/02/2023 4:48 PM
Traffic control cones or equivalent if required
Replacement Parts
Published
06/20/2023 4:47 PM
Safety glasses if required
Replacement Parts
Published
06/20/2023 4:47 PM
Medium Phillips (PH2) screwdriver
Tools
Published
04/24/2020 4:40 PM
Small Phillips (PH1) screwdriver
Tools
Published
05/14/2020 2:48 PM
Marker for marking the date on the desiccant bag
Replacement Parts
Published
07/12/2023 12:31 AM
LD-260 Disconnect Switch Power Off
Image
Published
04/24/2023 12:49 PM
DET-RPM-RAP-RM01 Desiccant Inspection and Replacement step 2-1
Image
Published
07/12/2023 9:19 AM
LD-260 Disconnect Switch Power On
Image
Published
05/04/2023 3:37 PM
DET-RPM-RAP-RM01

Inspect and replace desiccant in Rapiscan radiation portal monitor (RPM). (the frequency of required desiccant replacement will vary from site to site, type and quantity of desiccant and possibly season to season; the recommendation is to start monthly and adjust as necessary).

Equipment Hierarchy
Rapiscan CM-267 Conveyor Monitor
Rapiscan PM-700 Pedestrian Monitor
Rapiscan VM-250 Vehicle Monitor
Rapiscan TM-850 Rail Monitor
Frequency
Monthly
Technician Level
Technician Level
Technik 1
x 1
Duration
Time increment
minutes
Notes

5 minutes per pedestrian monitor; 10 minutes per vehicle monitor; 20 minutes per rail monitor (additional 10 minutes with protective cage)

Length of time
30
Tools Required
Keys to access RPM
Reflective safety vest if required
Ladder; 2 meters, 6 feet tall; non-conducting if required
Traffic control cones or equivalent if required
Safety glasses if required
Medium Phillips (PH2) screwdriver
Small Phillips (PH1) screwdriver
Marker for marking the date on the desiccant bag
Materials Required
Refuse bag
Absorbent cleaning rags
Desiccant
Originators
Craig Stinson
Bailey Toon
Originating Organization
PNNL
Approver
Craig Stinson
Safety Concerns
Vehicle traffic
Final Documentation
Routine maintenance report
Departmental Coordination

Prior to arrival, notify operators concerning expected work, duration, and anticipated alarms and fault indications.

Date of Origin
Version
0.00
Version #
Revision Date
Revision Author
Step 1

7969 - 7968 - Close lane; Remark:8224

Step 00
Step 2

7959 - 7958 - Inspect existing desiccant bags.; Remark:8233

Step 00
Obsługa
Step 3

7948 - 7944 - Install new desiccant bag(s) in place of removed bag; Remark: