Last Updated: 04/25/2025 1:41 AM

The following table lists all the components that make up the document.

Title Type Status Last Updated
Thermo FHT1377 PackEye
Device
Published
10/28/2024 3:37 PM
6676 - 6675 - Unpack Instrument; Remark:
Procedure Step
Published
12/09/2022 10:45 AM
6675 - Unpack Instrument
Instruction
Published
12/09/2022 10:45 AM
3869 - 313 - Power off instrument; Remark:3850
Procedure Step
Published
03/29/2022 2:23 AM
313 - Power off instrument
Instruction
Published
07/23/2021 2:41 PM
3850 - Press and hold the power button for approximately 10 seconds until indicator ...
Remark
Published
03/29/2022 1:38 AM
4223 - 4222 - Place instrument on flat surface; Remark:4221
Procedure Step
Published
05/10/2022 1:56 PM
4222 - Place instrument on flat surface
Instruction
Published
05/10/2022 1:54 PM
4221 - Shoulder straps should be facing down.
Remark
Published
05/10/2022 1:55 PM
3926 - 3876 - Open top of backpack; Remark:3928
Procedure Step
Published
04/05/2022 5:28 PM
3876 - Open top of backpack
Instruction
Published
04/04/2022 3:14 PM
3928 - IO PackEye Open Top of Backpack for Battery Access
Remark
Published
10/24/2024 6:52 PM
6217 - 6216 - Disconnect straps on sides of backpack; Remark:6215
Procedure Step
Published
11/28/2022 9:50 AM
6216 - Disconnect straps on sides of backpack
Instruction
Published
11/28/2022 9:46 AM
6215 -
Remark
Published
11/28/2022 9:50 AM
6709 - 6708 - Remove backpack contents; Remark:6707
Procedure Step
Published
12/09/2022 1:27 PM
6708 - Remove backpack contents
Instruction
Published
12/09/2022 1:26 PM
6707 - Slowly slide foam assembly out of backpack. This process might take two peopl...
Remark
Published
12/09/2022 1:27 PM
6710 - 6706 - Open protective foam; Remark:6705
Procedure Step
Published
12/09/2022 1:30 PM
6706 - Open protective foam
Instruction
Published
12/09/2022 1:27 PM
6705 - Use utility knife or scissors. Cut tape on one side of foam assembly.
Remark
Published
12/09/2022 1:28 PM
6674 - 6673 - Remove Faulty Gamma Detector; Remark:
Procedure Step
Published
12/09/2022 10:36 AM
6673 - Remove Faulty Gamma Detector
Instruction
Published
12/09/2022 10:36 AM
6225 - 6221 - Disconnect gamma detector; Remark:6220
Procedure Step
Published
11/28/2022 10:03 AM
6221 - Disconnect gamma detector
Instruction
Published
11/28/2022 9:59 AM
6220 - The gamma detector is connected to the FHT 681 amplifier at PMT1
Remark
Published
11/28/2022 10:03 AM
6724 - 1673 - Remove gamma detector; Remark:6723
Procedure Step
Published
12/09/2022 1:36 PM
1673 - Remove gamma detector
Instruction
Published
12/09/2022 1:34 PM
6723 - IO PackEye gamma detector over foam
Remark
Published
12/09/2022 1:36 PM
6725 - 6722 - Disconnect cable from gamma detector; Remark:6721
Procedure Step
Published
12/09/2022 1:41 PM
6722 - Disconnect cable from gamma detector
Instruction
Published
12/09/2022 1:37 PM
6721 - Keep the right-angle connector on the cable. Push toward connection, turn cou...
Remark
Published
12/09/2022 1:38 PM
6672 - 6671 - Install New Gamma Detector; Remark:
Procedure Step
Published
12/09/2022 10:36 AM
6671 - Install New Gamma Detector
Instruction
Published
12/09/2022 10:36 AM
6719 - 6328 - Reseat gamma connectors; Remark:6718
Procedure Step
Published
12/09/2022 1:40 PM
6328 - Reseat gamma connectors
Instruction
Published
11/29/2022 9:15 AM
6718 - Disconnect and reconnect both connections to the 90-degree elbow several time...
Remark
Published
12/09/2022 1:39 PM
6720 - 6717 - Set gamma detector in place; Remark:6716
Procedure Step
Published
12/09/2022 1:41 PM
6717 - Set gamma detector in place
Instruction
Published
12/09/2022 1:40 PM
6716 - Insert the gamma detector into the foam. Route the cable through the foam to ...
Remark
Published
12/09/2022 1:40 PM
6332 - 6328 - Reseat gamma connectors; Remark:6326
Procedure Step
Published
11/29/2022 9:18 AM
6326 - The gamma detector is connected at the FHT 681 amplifier at the connection la...
Remark
Published
11/30/2022 12:21 PM
6327 -
Remark
Published
11/29/2022 9:18 AM
303 - 302 - Reassemble instrument; Remark:
Procedure Step
Published
10/07/2022 1:49 PM
302 - Reassemble instrument
Instruction
Published
06/16/2021 11:28 PM
6737 - 6736 - Secure protective foam together; Remark:6735
Procedure Step
Published
12/09/2022 1:45 PM
6736 - Secure protective foam together
Instruction
Published
12/09/2022 1:44 PM
6735 - Re-wrap the foam assembly with electrical tape. Do not compress the foam....
Remark
Published
12/09/2022 1:45 PM
6333 - 6325 - Repack backpack; Remark:6323
Procedure Step
Published
11/29/2022 9:20 AM
6325 - Repack backpack
Instruction
Published
11/29/2022 9:18 AM
6323 - Slide the protective foam assembly into backpack
Remark
Published
11/29/2022 9:19 AM
6324 -
Remark
Published
11/29/2022 9:20 AM
6344 - 1383 - Close backpack; Remark:6343
Procedure Step
Published
11/29/2022 10:11 AM
1383 - Close backpack
Instruction
Published
11/19/2020 5:23 PM
6343 -
Remark
Published
11/29/2022 10:11 AM
6342 - 6341 - Perform Gamma High Voltage Adjustment; Remark:6340
Procedure Step
Published
11/29/2022 10:13 AM
6341 - Perform Gamma High Voltage Adjustment
Instruction
Published
11/29/2022 10:12 AM
6340 - DET-HHD-THR-PAK-RM05, PackEye Gamma High Voltage Adjustment.
Remark
Published
11/29/2022 10:13 AM
6435 - 2584 - Perform efficiency test; Remark:6434
Procedure Step
Published
11/30/2022 1:39 PM
2584 - Perform efficiency test
Instruction
Published
08/11/2021 3:55 PM
6434 - DET-HHD-THR-RM08, PackEye Efficiency Test.
Remark
Published
11/30/2022 1:38 PM
5761 - 319 - Perform operational test; Remark:5760
Procedure Step
Published
11/03/2022 2:58 PM
319 - Perform operational test
Instruction
Published
06/10/2021 8:31 PM
5760 - DET-HHD-THR-PAK-RM01, PackEye Operational Test
Remark
Published
11/03/2022 2:55 PM
322 - 321 - Document maintenance actions; Remark:
Procedure Step
Published
06/17/2021 9:49 AM
321 - Document maintenance actions
Instruction
Published
04/21/2025 11:19 AM
2869 - 2585 - Document maintenance performed; Remark:2866
Procedure Step
Published
06/18/2021 5:58 PM
2585 - Document maintenance performed
Instruction
Published
07/09/2021 12:15 PM
2866 - Record observations, times, and results for the maintenance report.
Remark
Published
04/21/2025 11:39 AM
4706 - 4705 - Submit report; Remark:4864
Procedure Step
Published
06/29/2022 9:50 AM
4705 - Submit report
Instruction
Published
06/29/2022 9:50 AM
4864 - As specified by management or contractual obligations.
Remark
Published
07/28/2022 1:36 PM
Corrective Maintenance Procedure
Document Type
Published
03/02/2020 3:32 PM
minutes
Duration
Published
05/26/2022 11:41 AM
As Needed
Frequency
Published
04/01/2020 11:36 AM
Technician 2
Skill Level
Published
04/09/2020 1:17 AM
Utility knife
Tools
Published
05/19/2020 1:54 PM
Power off Packeye
Image
Published
02/19/2022 1:48 AM
packeye_di_opentop_redarrow_00758.jpg
Image
Published
10/20/2023 12:55 PM
packeye_di_sidebuckle_open_outside.jpg
Image
Published
10/24/2023 10:18 AM
packeye_di_content_remove_4arrow.jpg
Image
Published
10/24/2023 10:20 AM
packeye_di_foamtape_remove.jpg
Image
Published
10/24/2023 11:18 AM
packeye_di_681removepmt1connector.jpg
Image
Published
10/24/2023 10:24 AM
packeye_di_gammadet_remove.jpg
Image
Published
10/24/2023 11:12 AM
packeye_di_gammaconnector_ondet_remove.jpg
Image
Published
10/24/2023 11:15 AM
packeye_di_gammaconnector_ondet_install.jpg
Image
Published
10/24/2023 11:17 AM
packeye_di_681installpmt1connector.jpg
Image
Published
10/24/2023 10:25 AM
packeye_di_foamtape_install.jpg
Image
Published
10/24/2023 11:18 AM
packeye_di_content_insert_2arrow.jpg
Image
Published
10/24/2023 10:21 AM
packeye_di_closetop_redarrow.jpg
Image
Published
10/24/2023 10:59 AM
DET-HHD-THR-PAK-CM11

Replace gamma detector in Thermo Scientific FHT 1377 PackEye.

Equipment Hierarchy
Thermo FHT1377 PackEye
Frequency
As Needed
Technician Level
Technician Level
Technician 2
x 1
Duration
Time increment
minutes
Length of time
30
Tools Required
Utility knife
Originators
Kilgannon, Erica
Tucker, Brian
Originating Organization
PNNL
Approver
Cody Hostick
Safety Concerns
None
Retest Requirements
Additional Retest Requirements Information

DET-HHD-THR-PAK-RM05, PackEye Gamma High Voltage Adjustment

DET-HHD-THR-PAK-RM08, PackEye Efficiency Test
 

Final Documentation
Corrective Maintenance Report
Departmental Coordination

Prior to arrival, notify operators concerning expected work, duration, and anticipated alarms and fault indications.

Date of Origin
Version
1.00
Step 1
Step 2
Step 3
Step 5
Step 6
Step 7
Main Step
Document Type
Corrective Maintenance Procedure
Percent Complete
100.00
Percent Complete W/Media
100.00